Laserfiche WebLink
k" KLEINFELDER <br /> To reduce the potential for Introducing contaminants Into the samples, the drive tip, <br /> galvanized pipe, and other equipment used for sample collection are steam cleaned <br /> and/or washed with trisodium phosphate or non-phosphate detergent solution and <br /> double rinsed with distilled water prior to use The sample probe and filters are cleaned <br /> In TSP solution and rinsed with methyl alcohol followed by a distilled water rinse prior to <br /> ' use New, factory-sterilized syringe needles, 0-rings, septums and sample tubes are <br /> used for each sample <br /> A-2.6 Sample Handling <br /> After labeling, the sample Is Immediately stored in an Iced cooler for transport to <br /> Kleinfelder's office sample control or to the analytical laboratory A Kleinfelder chain-of- <br /> custody form accompanies the cooler The chain-of-custody form includes Klelnfelder's <br /> name, address and telephone number, the employee number of the Individual who <br /> performed the sampling, the sample numbers, the date and time the samples were <br /> collected, the number of containers each sample occupies, the sample matrix (soil or <br /> water) and the analyses for which the samples are being submitted, if any The chain- <br /> of-custody form is signed by each person who handles the samples, Including all <br /> Kleinfelder employees and the receiving employee of office sample control or the <br /> analytical laboratory when the samples are delivered <br /> A-2 7 Decontamination of Equipment <br /> To reduce the potential for cross-contamination, augers and associated equipment are <br /> steam cleaned prior to drilling each boring In addition, sampling equipment is cleaned <br /> with a tnsodium phosphate or non-phosphate detergent wash and rinsed with distilled <br /> water prior to collecting each soil sample <br /> A-2.8 Soil Boring Closure and Cutting Disposal <br /> Soil borings are closed Immediately after the collection and logging of soil samples <br /> Closure Is accomplished by grouting the boring with a cement/bentonite slurry or as <br /> otherwise required <br /> Drill cuttings will be placed In 55-gallon drums wrapped in plastic or spread around the <br /> boring and left on site for disposal by the site owner If requested, Kleinfelder scan <br /> coordinate disposal of soil and water after analytical results are available <br /> A-3 GROUNDWATER WELL INSTALLATION <br /> A-3.1 Monitoring Well Construction <br /> Construction details for shallow groundwater monitoring wells are as follows <br /> • The well casing are 2- or 4-inch Inside diameter, flush threaded joint, schedule <br /> 40 PVC pipe <br /> 28209 T091ST05R13231DH Iv Page A-3 <br /> O 2005, Kleinfelder, Inc October 21, 2005 <br />