My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007505 CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2000
>
3500 - Local Oversight Program
>
PR0545768
>
ARCHIVED REPORTS_XR0007505 CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 10:25:46 PM
Creation date
6/9/2020 10:32:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007505 CASE 1
RECORD_ID
PR0545768
PE
3528
FACILITY_ID
FA0003881
FACILITY_NAME
GENERAL MILLS
STREET_NUMBER
2000
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95242
APN
02903013
CURRENT_STATUS
02
SITE_LOCATION
2000 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 GROUND WATER AND FREE-FLOATING PRODUCT DEPTH DETERMINATION <br /> A water/petroleum product interface probe was used to determine the free product thickness, if present, <br /> and a water level indicator was used to measure the ground water depth in monitoring wells that do not <br /> contain free product. Depth to ground water was measured from the top of each monitoring well casing <br /> The tip of the water level indicator was subjectively analyzed for product sheen All measurements and <br /> physical observations were then recorded in the field on separate data sheets presented in Enclosure B <br /> 2.0 SUBJECTIVE ANALYSIS OF GROUND WATER <br /> Prior to purging, a water sample was collected from the monitoring well for subjective analysis The <br /> sample was retrieved by gently lowering a clean, disposable bailer to approximately one-half the bailer <br /> length past the air/liquid interface The bailer was then retrieved, and the sample contained within the <br /> bailer was examined for floating product and the appearance of a petroleum product sheen <br /> 3.0 MONITORING WELL PURGING AND SAMPLING <br /> Monitoring wells were purged using a centrifugal pump or bailer until pH, temperature, and conductivity <br /> of the purge water had stabilized and a minimum of three to four well volumes of water had been <br /> removed Ground water removed from the wells was stored in 55-gallon barrels at the site The barrels <br /> were labeled with corresponding monitoring well numbers and the date of purging After purging, <br /> ground water levels were allowed to stabilize A ground water sample was then removed from each of <br /> the wells using a disposable bailer If the well was purged dry, it was allowed to sufficiently recharge <br /> and a sample was collected Samples were collected in air-tight vials, appropriately Iabeled, and stored <br /> on ice from the time of collection through the time of delivery to the laboratory A chain-of-custody <br /> form was completed to ensure sample mtegrity Ground water samples were transported to the laboratory <br /> and analyzed within the EPA-specified holding times for the requested analyses Purge water will be <br /> collected from the storage barrels in a vacuum truck and transported to an appropriate facility for <br /> treatment and/or disposal <br /> LRP120 TA <br />
The URL can be used to link to this page
Your browser does not support the video tag.