My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007441
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
4614
>
3500 - Local Oversight Program
>
PR0545770
>
ARCHIVED REPORTS_XR0007441
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 10:19:31 PM
Creation date
6/9/2020 2:27:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007441
RECORD_ID
PR0545770
PE
3528
FACILITY_ID
FA0006278
FACILITY_NAME
WOODBRIDGE VINEYARD ASSOC
STREET_NUMBER
4614
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
4614 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} <br /> r <br /> • SEBASTIAN f VINEYARDS <br /> SEBA>TIANI SONOMA CAS,<WINES Rf(HARD(UNEO VINTAGE SPARKLING WINES <br /> 1L,(f ST,FSAST14NI COUNTRY 4RitTALS URAPPA DI SEBAbTIANI <br /> 4LGL ST SEBASTIAN!PROPRIETOR S WIVES VEND.k"GE <br /> NATHANSON( REEK <br /> February 21, 1996 <br /> Steve Sasson <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> P O Box 388 <br /> Stockton, CA 95210-0388 <br /> RE 4614 W Turner Rd , Lodi, San Joaquin County <br /> SITE CODE 1383 <br /> Dear Steve, <br /> After the third quarter sampling in 1995, Sebastiani Vineyards began the process of <br /> contracting with a professional consultant (certified engineer or geologist) to prepare <br /> reports on the above referenced site Part of this process included getting pre-approval <br /> for reimbursement from S8 2004 funds <br /> The fourth quarter sampling was delayed until an engineer was selected and funds <br /> were approved This process took longer than anticipated, and the fourth quarter 1995 <br /> sampling was missed <br /> As we discussed on the phone yesterday, funding has been approved and an <br /> engineer, Steve Muir of WZI, will be compiling data and preparing a closure report for <br /> the site <br /> In the meantime, first quarter sampling for 1996 has been scheduled for Friday, March <br /> 8, 1996, beginning at 10 am As in the past, Caltest Labs will be doing the testing <br /> Monitoring Wells 1, 2, and 3 are scheduled to be sampled In addition, at the request <br /> of Mr Muir, all 9 Monitoring Wells will be measured for depth to water so that a <br /> complete gradient can be prepared <br /> Yours truly, <br /> J Stephen Manildi <br /> ['C7 ROTC 1290 %V(_)0Df3R1P(;E ('ALIL()RNIA 952:1-209-339-1311 FAX 209.33Q-1348 <br />
The URL can be used to link to this page
Your browser does not support the video tag.