Laserfiche WebLink
f <br /> .i <br /> F <br /> SIDE VIEW REAR VIEW <br /> Aeration Tank Control Panel <br /> Control Panel Carbon Cannister <br /> Aeration Tank <br /> 000 <br /> Aeration Blower <br /> Carbon Cannister <br /> . Double—Containment <br /> Double—Containment Pallet <br /> JackO Pallet <br /> 0 <br /> 0 <br /> Grade <br /> PLAN VIEW Instrumentation Readouts <br /> Aeration Tank Double—Containment Flow Meter <br /> Pallet Flow Totalizer <br /> inlet High Pressure Switch <br /> Inlet High—High Pressure Switch <br /> Aeration Tank High—High Level Switch <br /> Trailer Activated Carbon High Pressure Switch <br /> Sample Ports <br /> Influent (Between Aeration Tank And First Carbon Cannister) <br /> Effluent (Between Carbon Cannisters) <br /> Easy Disconnects At Carbon Cannisters <br /> Aeration Blower 0 <br /> Carbon Cannister Remote Signal Capabilities <br /> ZZ __=4 <br /> Water Flow <br /> Control Panel Additionci Total Water now <br /> Drum Location On/Off Status <br /> (VES Condensate Knockout Drum, etc.) <br /> 0 4 8C <br /> � Trailer— Mounted <br /> I _ 1 EEc � N <br /> CALIFORNIA ENVIRONMENTAL ENGINEER$ h CONIRACTORs G r o u n d wat e r Fi e at n-i e n t <br /> APPROXIMATE SCALE IN FEET System <br /> Drawing: GTS- 1 Date: 5/3/93 <br />