Laserfiche WebLink
DEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> 1996 <br /> PROJECT NAME-ARC PUMP &WELDINGAMPLE ANALYSIS PERFORMED TPH-Gas, B T X E <br /> 1211 SOUTH TURNPIKE ROAD AMPLE TIME: 13 20 <br /> STOCKTON,CA 95206 AMPLE CONTAINER(S): HCL PRESERVED <br /> V.O A's& 1 BAILER BLANK <br /> NALYSIS PERFORMED BY- FGL LABS <br /> CLIENT: HUNTER&ASSOCIATES DATE: 04/03/1996 <br /> PROJECT MANAGER- BILL HUNTER SAMPLE LOCATION: MW-3 <br /> AMPLER DON LIGHT START TIME <br /> GROUNDWATER XXX ]� AC7WE: OTHER <br /> CASING ELEVATION: FEET MSLCASING DIAMETER: 2 INCH <br /> DEPTH TO WATER 32 67 FEET CALCULATED CASING VOLUME 2 80 GAL <br /> DEPTH OF WELL 50 02 FEET TOTAL VOLUME PURGED 9 0 GAL <br /> TIME VOLUME pH E.0 TEMP. O R.P. COLOR OTHER <br /> gallons units Umhoslcm Degrees C (Mvolts) (Visual <br /> 0 71 1493 210 NIA TURBID STRONG GAS <br /> GRE ODOR <br /> 30 73 1350 211 <br /> 60 74 1302 206 <br /> 90 73 1303 207 " <br /> PURGE METHOD . T STAINLESS STEEL BAILER WITH MANUAL BAILER SPOOL <br /> SAMPLE METHOD. T STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE: DEPTH TO WATER AT SAMPLE TIME- 32 89' <br /> WELL INTEGRITY. CAP AND SEAL ARE SECURE, NO LOCK IS INSTALLED <br /> REMARKS: GOOD RECHARGE <br /> WEATHER- CLOUDY SKIES <br /> QUALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER &ALCONOX <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION EASTERN <br /> CONTAINMENT- POLY DRUMS <br /> INSTRUMENTATION. ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4 0 & 7 0) <br /> ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br />