My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012757
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
1587
>
3500 - Local Oversight Program
>
PR0545772
>
ARCHIVED REPORTS_XR0012757
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:33:55 PM
Creation date
6/9/2020 3:11:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012757
RECORD_ID
PR0545772
PE
3528
FACILITY_ID
FA0003553
FACILITY_NAME
PUNLA, ALVARO & CARMEN
STREET_NUMBER
1587
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16503015
CURRENT_STATUS
02
SITE_LOCATION
1587 TURNPIKE RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.»rte�.. _ 3�f_- g.. ..ham• re+se,. <br /> l <br /> Y' <br /> - Names of collectors <br /> - Dates and times of collection <br /> - Purpose of sample <br /> - Sample distribution (e.g., laboratory, archive, etc. ) <br /> is - Field observations <br /> I <br /> - Field measurements (e.g., PID readings, pH, <br /> F4 conductivity, water levels). <br /> 1 ` - Other data records (e.g. development log, soil sampling <br /> report, well log, etc. ) <br /> Procedures for surface soil collection from shallow test <br /> pits are discussed in the appended Soil Sampling Protocol. <br /> s-� Soil samples will be collected using decontaminated <br /> equipment and placed in laboratory prepared containers. <br /> All drilling equipment, pipe, and materials coming in <br /> 'a contact with the borehole material will be decontaminated <br /> 1 + before use according to the procedures described in Section <br /> 6.0. All sampling equipment will be decontaminated prior to <br /> fx sampling following these same procedures. <br /> Soil sample.; will be collected as monitoring wall drilling <br /> progresses. All downhole drilling equipment will be <br /> d. decontaminated prior to use and between use for each well <br /> according to the procedures described in Section 6.0. <br /> F� All well construction material, including well casing, <br /> #.Q screen, and well caps, will be decontaminated prior to <br /> installation by steam cleaning according to the procedures <br /> ►' described in Section 6.0. <br /> To prevent the transfer of surface contamination to a well, <br /> a Portland cement and bentonite surface seal will be <br /> f installed in conformance with regulatory requirements. The <br /> )' casing will be fitted with a water tight locking cap. No <br /> solvent or glue will be used in well construction. The <br /> I; wellhead will be contained below, grade in a water-tight <br /> i# traffic rated box or otherwise protected from damage. <br /> E-. In order to assure that groundwater samples are obtained <br /> from formation material and not from the filter pack, wells <br /> will be purged in accordance with the appended <br /> Wall Development Protocol. <br /> i <br /> Samples will be placed in laboratory__prepared containers:. <br /> appropriate for the analyses specified as indicated on Table <br /> r <br /> �v <br />
The URL can be used to link to this page
Your browser does not support the video tag.