Laserfiche WebLink
revealed in the collected samples of soil or groundwater Analytical results of soil samples <br /> Y p <br /> collected from ASB-1 were wholly nondetectable Based on these results, Water Warks <br /> 1 concluded that waste-oil contamination did not appear to spread laterally beneath the on-site <br /> building <br /> On December 15, 1989, soil was overexcavated from the western wall near the former diesel <br /> UST area Laboratory analytical results revealed a TPH-d concentration of 30 6 ppm at 6 feet, <br /> TPH-d was not detected in samples collected at depths of 2 feet or 16 feet <br /> ' Ground-water samples collected from M - <br /> P W 1 in February of 1990 indicated a TPH-d <br /> concentration of 350 ppm A TPH-d concentration of 59 ppm was detected in a sample collected <br /> two months later in April of 1990 <br /> On September 27, 1993, Roger Foote Associates (RFA) of West Sacramento drilled three soil <br /> borings, two of which were converted to ground-water monitoring wells, MW-2 and MW-3 <br /> Soil boring ASB-2 was drilled at an angle of about 30° to vertical and was extended to an <br /> equivalent vertical depth of 33 5 feet Both monitoring wells were completed to a total depth <br /> of 50 feet <br />' Selected soil samples were analyzed for TPH-d, TPH-g, and BTEX constituents by California <br /> Laboratory Services of Rancho Cordova, a State-certified analytical laboratory Soil samples <br /> collected from ASB-2 Q 6 & 19 feet, MW-2 @ 15, 35 & 40 feet, and MW-3 @ 35 & 40 feet <br /> below surface grade (bsg) were found nondetectable for all constituents Ground water was <br /> encountered at an average depth of 45 feet bsg <br /> I W W Iran, Inc of Merced was awarded the contract to perform ground-water monitoring by <br /> Ms Carmen Punla in January of 1995 Monitoring wells MW-1 through MW-3 were first <br /> sounded and sampled by W W Irwin, Inc on February 6, 1995 Mr Harlin Knoll of the San <br />' Joaquin County Division of Environmental Health has attended all scheduled monitoring <br /> activities Ground-water monitoring was also performed on May 9, August 11, and November <br /> 30, 1995 <br /> GROUND-WATER MONITORING - APRIL 2, 1996 <br />' Ground-Water Soundings <br />' The last SJCPHD-EHO-required ground-water monitoring activity was conducted on April 2, <br /> 1996 Utilizing a Keck® interface probe, the W W Irwin, Inc staff geologist determined that <br /> the average, piezometric depth-to-water underlying the site was 28 19 feet bsg The water table <br />' underlying the site has risen 3 41 feet in the 4-month period since November 30, 1995 when the <br /> average depth to water was 31 60 feet bsg <br /> W W Irma Inc <br /> Projects 33236 00&33236 01 <br /> April 1996 3 <br />