My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007175
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
1587
>
3500 - Local Oversight Program
>
PR0545772
>
ARCHIVED REPORTS_XR0007175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 10:19:02 PM
Creation date
6/9/2020 3:12:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007175
RECORD_ID
PR0545772
PE
3528
FACILITY_ID
FA0003553
FACILITY_NAME
PUNLA, ALVARO & CARMEN
STREET_NUMBER
1587
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16503015
CURRENT_STATUS
02
SITE_LOCATION
1587 TURNPIKE RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> The soundings were converted using casing-top elevations previously established by RFA The <br /> elevation data were used to calculate the present ground-water flow direction and gradient by <br /> I the three-point method The local flow direction on November 30, 1995 was calculated at <br /> N87°E along a virtually flat gradient of 0 004 foot/foot (see the Ground-Water Gradient Map, <br /> Figure 3) The flow direction has shifted dust 4° to the north since August 11 when it was <br /> approximately S89°E along a gradient of 0 003 foot/foot Sounding and flow direction data are <br /> listed in Table 1 <br /> TABLE 1 <br /> Ground-Water Sounding Data <br /> Carmen Punta Property-Stockton <br /> Weil Sounding Depth to Casing-Top Water Table Flow Direct"0 <br />' Number Date Water Elevation Elevation Gradient(FC/Ft) <br /> (Ft) (Ft AMSL) (Ft BMSA.) <br /> Mw-1 10/01/93 39 65 1087 -2878 N89°E Q 003 <br />' 02/06/95 3672 -25 85 N83°E 004 <br /> 05/09/95 3292 -2205 S80°B Q 003 <br /> 08/11/95 3249 -21 62 S89°E 003 <br /> 11/30/95 3230 -21 43 N87-E 004 <br /> IMW-2 10/01/93 38 31 9 65 -2866 <br /> 02/06/95 35 17 -25 52 <br /> 05/09/95 3135 -2170 <br /> 08/11/95 3089 -21 24 <br /> 11/30/95 3066 -21 01 <br /> MW-3 10/01/93 39 17 1028 -2889 <br /> 02/06/95 36 19 -25 91 <br /> 05/09/95 3248 -2220 <br /> 08/11/95 3207 -21 79 <br /> 11/30/95 13185 1 -2157 <br /> Ground-Water Sampling <br /> Prior to normal well-sampling procedures on November 30, 1995, ground-water sampling <br /> equipment was steam-cleaned and/or washed in Liquinox® prior to sampling and between <br /> samplings of each well Water-condition parameters of temperature, electrical conductivity, and <br /> pH were measured and logged during well-purging prior to sampling the wells Purging was <br /> continued until at least three well-volumes of water were removed from each well, and water- <br /> condition parameters had stabilized Well Sampling and Monitoring Logs are included as <br /> Appendix A <br /> W W Irwin, Inc <br /> Project No 33236 00 <br /> January 1996 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.