My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007178
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
1587
>
3500 - Local Oversight Program
>
PR0545772
>
ARCHIVED REPORTS_XR0007178
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 10:20:59 PM
Creation date
6/9/2020 3:14:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007178
RECORD_ID
PR0545772
PE
3528
FACILITY_ID
FA0003553
FACILITY_NAME
PUNLA, ALVARO & CARMEN
STREET_NUMBER
1587
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16503015
CURRENT_STATUS
02
SITE_LOCATION
1587 TURNPIKE RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The soundings were converted using casing-top elevations previously established by RFA The <br /> elevation data were used to calculate the present ground-water flow direction and gradient by <br /> the three-point method The local flow direction on May 9, 1995 was approximately S$0°E <br /> along a gradient of 0 003 foot/foot as shown on the Ground-Water Gradient Map, Figure 3 The <br /> flow direction has shifted 17° to the east and south since February 6, 1995 Sounding and flow <br /> direction data are listed to Table 1 <br /> ' ABLE 1 <br /> Ground-Water Sounding Data <br /> Carmen Punta Property-Stockton <br />' Water Table <br /> Well Sounding Depth to Casing-Top EtevatIou Flow Direction 0 <br /> Number Date Water Elevation (Ft BMSL) Gradient(EM) <br /> (Ft) (ft AMSL) <br />' MW-I 10/01/93 3965 1087 -2878 N89°E?@ 003 ft/ft <br /> 02/06/95 3672 -25 85 N83°E g 004 ft/ft <br /> 05/09/95 3292 -2205 S80-E @ 003 ft/ft <br />' MW-2 10/01/93 3831 965 -28 66 <br /> 02/06/95 35 17 -25 52 <br /> 05/09/95 J 3135 _2170 <br /> MW-3 10/01/93 39 17 1028 -2889 <br /> 02/06/95 36 19 -25 91 <br /> 05/09/95 3248 -2220 <br />' Ground-Water Sampling <br /> Prior to normal well-sampling procedures on May 9, 1995, ground-water sampling equipment <br /> was steam-cleaned and/or washed in Liquinox®prior to sampling and between samplings of each <br /> well Water-condition parameters of temperature, electrical conductivity, and pH were measured <br /> and logged during well-purging prior to sampling the wells Purging was continued until at least <br />' three well-volumes of water were removed from each well, and water-condition parameters had <br /> stabilized The Well Sampling and Monitoring Logs are included as Appendix A <br /> WW I"n Inc <br /> Project No 33236 00 <br /> May 1995 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.