Laserfiche WebLink
TABLE 2 <br /> ANALYTICAL RESULTS GROUND WATER <br /> Carmen Punta Property-Stockton <br /> Results reported in leg/P except as noted <br /> OB& <br /> Well Number Sampling 'fRPft-d TPH g Grease Benzene Toluene Fahy]- Xylenes <br /> Date (eagle) benzene <br />' MWA 10/01/93 ND NA ND ND ND ND ND <br /> 02/06/95 ND ND ND ND ND ND ND <br /> 05/09/95 ND ND ND ND ND ND ND <br /> MW-2 10/01/93 ND NA NA ND ND ND ND <br /> 02/06/95 ND ND NA ND ND ND ND <br /> 05/09/95 ND ND NA ND ND ND ND <br /> MW-3 10/01/93 ND NA NA ND ND ND ND <br /> 02/06/95 ND ND NA ND ND ND ND <br /> 05/09/95 ND ND NA ND 03 ND ND <br /> Reporting 10/01/93 50 50 5 mg/l 0 3 0 3 0 3 0 3 <br />' Lmvt 02/06/95 50 1 5 mg/P 0 3 0 3 0 3 0 3 <br /> mµg/Q 05/09/95 50 50 5 mglf 0 3 0 3 0 3 0 3 <br />' ND Not detected above the laboratory reporting lemut <br /> NA Not Analyzed <br /> MCLsam,ug/e benzene=1,toluene=100,ethylbenzene=680,toeal xylenes=1750 <br /> SUAMARY <br /> Monitoring wells MW-1, MW-2, and MW-3 were sounded and sampled on May 9, 1995 <br />' Utilizing a KeckO interface probe, the WW Irwin, Inc staff geologist intercepted the <br /> piezometric surface in the wells at an average depth of 32 25 feet bsg Due to a very wet <br />' season, the water table has risen an average of 3 78 feet since the wells were sampled on <br /> February 6, 1995 <br /> Using the three-point method, the calculated local direction of ground-water flow on May 9, <br /> 1995 was approximately S80°E along a gradient of 0 003 foot/foot The flow direction has <br /> shifted 17' to the east and south since February 6, 1995 <br /> EGround-water samples were collected from the three wells, refrigerated, and received at <br /> Sherwood Labs on May 9, 1995 The samples were analyzed for oil & grease, diesel, gasoline, <br /> and 13TEX constituents The report of analytical results revealed wholly nondetectable <br /> concentrations of all constituents except for toluene, detected fractionally at the reporting limit <br /> of 0 3 µgIf in the sample collected from MW-3 <br /> The next monitoring activity is scheduled for early August, 1995 <br /> W W Irmn,Inc <br /> Project No 33236 00 <br /> May 1995 <br /> 6 <br /> E <br />