Laserfiche WebLink
W. W. IRWIN WELL SAMPLING & MONITORING LOG <br /> PROJECT DATA <br /> Project #033236.00 Project Name Carmen Punla Pro ert Date 05/09/95 <br /> Site Address 1587 French Cam Turnpike Stockton CA <br /> Sampler Mike Luksic Weather 60° <br /> P <br />' WELL DATA 71 <br /> 1 L:-�� <br /> Well ID# MW-3 Well Diam. 2" Well Depth 49.88' <br /> Well Volume 2 .8 gal <br /> Groundwater Elev. -22.20, Depth to H2O 32^ .48' <br />' Ref. Pt. Description T.0 C. Ref. Pt. Elev. 10.28' <br /> Measurement Technique Keck interface robe <br /> SAMPLING DATA - GROUND WATER <br /> tChain of Custody Yes Purge Drum(s) on Site Yes <br /> Begin Purge 14: 30 End Purge 15: 15 Pumping Rate 1 m <br /> Total Vol . Pumped 9 al Containers 2 VOAs 1 Litre Amber <br /> Sampling Equip. /Procedure Dis osable bailer <br /> Sample Storage Method On ice to refrigerated storage <br /> ' Constituents and Parameters BTEX & TPH-GAS 8015/Diesel <br /> L= <br /> FIELD ANALYSIS <br /> Time 14:30 14:50 15:00 — --- <br /> ' E. C. _0.8x100 —1. 3x100 1 . 3x100 -- <br /> pH _6.88 _6.90 6.96 - <br /> ' <br /> Temp 62 .70 63 .50 63.90 <br /> - <br /> LNotes: <br />