My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007180
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
1587
>
3500 - Local Oversight Program
>
PR0545772
>
ARCHIVED REPORTS_XR0007180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 10:18:54 PM
Creation date
6/9/2020 3:14:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007180
RECORD_ID
PR0545772
PE
3528
FACILITY_ID
FA0003553
FACILITY_NAME
PUNLA, ALVARO & CARMEN
STREET_NUMBER
1587
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16503015
CURRENT_STATUS
02
SITE_LOCATION
1587 TURNPIKE RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The soundings were converted using casing-top elevations previously established by RFA_ The <br /> elevation data were used to calculate the present ground-water flow direction and gradient by <br /> the three-point method The local flow direction on May9, 19 595 wasGradient pro iF tel 3 gThe <br /> along a gradient of 0 003 foot/foot as shown on the Ground <br /> flow direction has shifted 17° to the east and south since February b, 1995 Sounding and flow <br />' direction data are listed in Table 1 <br /> TABLE 1 <br /> Ground-Water Sounding Data <br />' Carmen Punta Property-Stockton <br /> Water Table <br /> Well Sounding Depth to rasing-Top Elevation Flow 1hremon IV <br /> 1 Number Dote Water ElEvation (Ft BMSO Gradient cFtli tl <br /> (R) (A AMSL) <br /> MW-1 10/01/93 39 65 1087 -2878 N89-F,0 003 ft/ft <br /> 02/06/95 3672 -25 85 N83-IB @ 004 ft/ft <br /> 05/09/95 3292 -2205 S80°E @ 003 ft/ft <br /> MW-2 10/01/93 3931 965 -2866 <br />' 02/06/95 35 17 -25 52 <br /> 05/09/95 3135 -2170 <br /> MW-3 10/01/93 39 17 1028 25 89 <br /> 02/06/95 3619 _22 20 <br /> 05/09/95 3248 <br /> ' Ground-Water Sampling <br /> Prior to normal well-sampling procedures on May 9, 1995, ground-water sampling equipment <br /> was steam-cleaned and/or washed in Liquinoxe prior to sampling and between samplings of each <br /> t well Water-condition parameters of temperature, electrical conductivity, and pH were measured <br /> the wells Purng was continued until at <br /> and logged during well-purging prior to' east <br /> sampling each well, and water-condition parameterslhad three well-volumes of water were removed from <br /> stabilized The Well Sampling and Monitoring Logs are included as Appendix A <br /> WW Irwin Inc <br /> Project No 33236 00 4 <br /> May 1995 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.