Laserfiche WebLink
TABLE 2 <br /> ANALYTICAL RESULTS GROUNDWATER <br /> Carmen Punta Property-Stockton <br /> Results reported m pgl t except as voted <br /> ' <br /> on& <br /> Well Number Sampliag TRPH-d TYH-g Grewe Beazm Toluene Ethyl- Xylenes <br /> Date (utglf) benzene <br /> MW-1 10/01/93 ND NA ND ND ND ND ND <br /> 02/06/95 ND NO ND ND ND ND ND <br /> 05/09/95 ND ND ND ND ND ND ND <br /> MW-2 10/01/93 ND NA NA ND ND ND ND <br /> 02/06/95 ND ND NA ND ND ND ND <br /> 05/09/95 ND ND NA ND ND ND ND <br /> MW-3 10/01/93 ND NA NA ND ND ND ND <br /> 02/06/95 ND ND NA ND ND ND ND <br /> 05/09/95 ND ND NA ND 0 3 ND ND <br /> Reporting 10101/93 50 50 5 mgl P 03 03 03 0 3 <br /> Lieut 02/06/95 50 1 5 mgle 03 03 03 03 <br /> inµgff 1 05/09/95 1 50 1 50 S mg1P 0 3 03 03 03 <br /> 001M <br /> ' ND Not detected above the laboratory reporting lung <br /> NA Not Analyzed <br /> MCLS to gg/P benzene-1,toluene=100,ethylbenzene=680,total xylenes=1750 <br /> SUMMARY <br /> Monitoring wells MW-1, MW-2, and MW-3 were sounded and sampled on May 9, 1995 <br /> Utilizing a Keck' interface probe, the WW Irwin, Inc staff geologist intercepted the <br /> piezometric surface In the wells at an average depth of 32 25 feet bsg Due to a very wet <br /> season, the water table has risen an average of 3 78 feet since the wells were sampled on <br /> February 6, 1995 <br /> Using the three-point method, the calculated local direction of ground-water flow on May 9, <br /> 1995 was approximately S80°E along a gradient of 0 003 foot/foot The flow direction has <br /> shifted 17° to the east and south since February 6, 1995 <br /> Ground-water samples were collected from the three wells, refrigerated, and received at <br /> Sherwood Labs on May 9, 1995 The samples were analyzed for oil & grease, diesel, gasoline, <br /> and BTEX constituents. The report of analytical results revealed wholly nondetectable <br /> concentrations of all constituents except for toluene, detected fractionally at the reporting limit <br /> of 0 3 µgff in the sample collected from MW-3 <br /> The next monitoring activity is scheduled for early August, 1995 <br /> 1 <br /> WW Irxgn Inc <br /> Project No 33236 00 <br /> May 1995 <br />