My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007184
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
1587
>
3500 - Local Oversight Program
>
PR0545772
>
ARCHIVED REPORTS_XR0007184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 10:18:03 PM
Creation date
6/9/2020 3:15:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007184
RECORD_ID
PR0545772
PE
3528
FACILITY_ID
FA0003553
FACILITY_NAME
PUNLA, ALVARO & CARMEN
STREET_NUMBER
1587
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16503015
CURRENT_STATUS
02
SITE_LOCATION
1587 TURNPIKE RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Mr Harlan Knoll <br /> September 20, 1993 <br /> Page 6 <br />' product, they will be developed by surging with a vented surge block and by pumping until <br /> approximately four to five well volumes are purged and stable field readings of pH, <br /> specific conductivity, and temperature are obtained After groundwater returns to <br />' approximately 90% of static groundwater elevation, the well will be sampled using a clean <br /> bailer, the groundwater will be transferred slowly through bailer ports to laboratory <br />' sterilized glass receptacles and transported directly to the laboratory under a Chain of <br /> Custody Groundwater samples collected from the existing well will be analyzed for <br />' TPHg and TPHd using EPA method 8015 (modified), for BTEX using EPA method 602, <br /> for chlorinated hydrocarbons using EPA 601, for total oil and grease, and for priority <br />' y metals Groundwater samples collected from the new wells will be analyzed for TPHd and <br /> BTEX <br />' Purged groundwater will be stored onsite in labeled 55-gal drums Disposal <br /> options for this water and the driller's rinse water depend on the results of laboratory <br /> analyses Responsibility for disposal belongs to the site owner, however, RFA can take <br /> appropriate measures to responsibly dispose of the water upon request by the owner <br /> The proposed investigation will follow protocols approved by the San Joaquin <br /> County Environmental Health Department (SJEHD) and the Central Valley Regional <br /> Water Quality Control Board (CVRWQCB) The proposed wells will be constructed and <br /> borings will be drilled after appropriate permits are issued by SJEHD <br /> SCHEDULE <br /> I We plan to begin work immediately after this work plan is approved and the well <br /> permits are issued by SJEHD A written report of our findings should be completed in <br /> approximately four to six weeks following completion of the field work Evaluation and <br /> recommendations for further site remediation will be based on the results of our <br /> preliminary investigation <br /> ROGER <br /> I 323-001 scw FDT T <br /> ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.