Laserfiche WebLink
P <br /> 1 <br /> t <br /> Dor proi`essloaal wises were pravlded migg that ftrm of Bare atkd WU ordittaKly exomised by <br /> cstviranmental cousultanu pradiong in this-or slmilar localifie& Tke Tndiags were MAWly Based UP= <br /> 400y6cal remelts proyWed by-an lridepoodmt laboratory. Evaballoos of the 00"00"s s at tete site for the <br /> parp at this investigation are made from a limited number ofavaildble dala,pwnt;s and canditions:tray <br />' v-tri+AWAY l am Otm 44U t40% The WOMIA004 CoOWoed to mix mport leas re 4Y*d app pria#e <br /> technical renew sad approval. This acknowwledgea amt is made in Ilett of all warraatles� 40ther expressed <br /> Or Implied, <br />' Project MONITORING WELL INSTALLATION AND SAMPLING <br /> May/June 1994 <br /> Comfort Air <br />' 1607 Turnpike Road <br /> Stockton, California <br /> Project No. 787-S <br />' Performed by Geological Audit Services, Inc <br /> 1803 West March Lane, Suite A <br /> Stockton, California 95207 <br /> I <br /> Report Prepared By <br /> Kevin McKibben T _ - Date <br /> Staff Geologist <br /> Reviewed and Approved by <br /> 'h4v .S SR D G °�0 <br /> Bob Marty kate <br /> Staff Geologist <br /> JOH111 � 4 <br /> I <br /> 719/9 <br /> dot►n ay abs Date ATE OF <br /> lar ol991st <br /> Registered-Geologist #3489 <br /> I <br />