Laserfiche WebLink
1 <br />' 04 June 2003 <br /> ,. <br /> AGE-NC Project No 95-0141 <br />' Page 5 of 5 <br />' Preparation of a work plan for interim remediation of petroleum hydrocarbon-impacted <br /> ground water at the site <br />' 6.0. LIMITATIONS <br /> i <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site have been made from a limited number of available data points(I a monitoring <br /> wells and ground water samples) and subsurface conditions may vary away from these data points <br /> No other warranty,expressed or implied, is made as to the professional interpretations,opinions and <br /> recommendations contained in this report <br /> I <br />