My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007072
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
1607
>
3500 - Local Oversight Program
>
PR0545774
>
ARCHIVED REPORTS_XR0007072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 3:38:16 PM
Creation date
6/10/2020 12:22:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007072
RECORD_ID
PR0545774
PE
3526
FACILITY_ID
FA0004998
FACILITY_NAME
COMFORT AIR
STREET_NUMBER
1607
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1607 TURNPIKE RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Contamination was detected in the deepest recovered sample from MW-6 at a depth of 65 feet bsg <br /> One soil sample collected from the pilot boring for MW-8 contained 1,2-DCA at a concentration of <br /> 15 mg/kg Soil samples from the pilot boring for MW-7 did not contain detectable concentrations <br /> of analytes of concern TPH-g, BTEX and 1,2-DCA were detected in the initial ground water <br /> samples collected from MW-6, MW-7 and MW-8 Details of the procedures and results of the <br /> monitoring well installation were presented in Monitoring Well Installation Report-Fourth Quarter <br /> 2000, dated 16 January 2001, prepared by AGE <br /> VERTICAL SITE ASSESSMENT <br /> On 10 October 2002, a soil boring (CPT-01) was advanced vertically on-site to a total depth of <br /> approximately 147 feet below surface grade (bsg), utilizing CPT technology to characterize the <br /> geological and hydrogeological framework and to identify potential contaminant-migration pathways <br /> beneath the site Based on the CPT lithologic sounding data, depth-discrete "grab" ground water <br /> samples and a soil sample were collected in a "twin" soil boring placed immediately adjacent to <br /> CPT-01,the water samples collected were assigned the boring designation of the initial CPT boring <br /> (CPT-1) However,the twin boring could only achieve a maximum sampling depth of approximately <br /> 117 feet bsg before encountering refusal <br /> LABORATORY RESULTS OF SOIL/CPT"GRAB" GROUND WATER SAMPLES <br /> • Only one soil sample (CPT1-1-85) was collected and submitted for analysis during the Fourth <br /> Quarter 2002 TPH-g, toluene, ethylbenzene, and total xylenes were detected in the sample at <br /> concentrations of 1 6 mg/kg, 16 micrograms/kilogram(gg/kg),5 1 µg/kg and 24µg/kg,respectively, <br /> benzene was not detected in the soil sample <br /> A total of two "grab" ground water samples were collected from CPT-01,between 96 and 100 feet <br /> bsg and between 113 and 117 feet bsg TPH-g was detected in both samples at concentrations of <br /> 13,000 µg/1 and 140,000 µg/l, respectively BTEX compounds were detected in both samples at <br /> concentrations as high as 4,600 µg/1 benzene, 16,000 µg/1 toluene, 2,100 µg/1 ethylbenzene and <br /> 11,000µg/1 total xylenes(CPT-01-113-117) In addition, 1,2-DCA was detected in both samples at <br /> concentrations of 8 8 µg/1 and 250 gg/l,respectively EDB was detected in sample CPT-01-113-117 <br /> at a concentration of 90 µg/1 <br /> ADDITIONAL MONITORING WELL INSTALLATION/ABANDONMENT <br /> Between 14 October and 23 October 2002, soil borings were advanced at the site to install <br /> monitoring wells MW-8B, MW-9A/B, MW-IOA/B, MW-11A/B and MW-12A/B and one ground <br /> water monitoring/extraction well EX-1 Pilot borings MW-8B,MW-9A/B,MW-10AB,MW-IIA/B <br /> and MW-12AB were completed as ground water monitoring wells using two-inch diameter PVC <br /> casing with 0 020-inch slotted screen The screen was installed from approximately 15 to 35 feet bsg <br /> • in MW-9A through MW-12A, and from 60 to 65 feet bsg in wells MWBB through MW-1213, with <br /> Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.