Laserfiche WebLink
1 <br /> f RESNA EMPLOYEE'S INJURY AND ILLNESS <br /> SITE SAFETY PLAN PREVENTION PROGRAM <br /> ' <br /> Job Name: Gaut Property <br /> Job Location: 1607 Turnpike Road <br /> ' Client Name: Greg Gaut <br /> ' Project Number: W0599.00 Date: January 28, 1992 <br /> ' SSP Prepared by: Tom Lutterman <br /> Site Safety Officer: Tom Lutterman <br /> ' This site safety and health plan (SSP) must be kept on-site and accessible to all on-site <br /> employees during all phases of site operations. The SSP must be reviewed and signed by <br /> ' all on-site employees, subcontractors, and visitors prior to entering the site. General safe <br /> work practices are identified in the RESNA Injury and Illness Prevention Manual and apply <br /> to all RESNA work sites. <br /> The provisions set-forth in this SSP shall apply to RESNA Industries Inc. (RESNA) <br /> employees and any subcontractors working for RESNA at the job site. All personnel <br /> t working for RESNA at the job site must read this SSP, and sign the attached Compliance <br /> Agreement before entering the work area. Field personnel may deviate from the safety <br /> provisions set-forth in this SSP, but only to upgrade or increase the safety requirements. <br /> ' RESNA personnel may suspend work if unauthorized modifications to the safety provisions <br /> set-forth in this SSP are made. If changes in site or working conditions require changes <br /> ' in safety procedures, appropriate amendments to this SSP will be provided by the RESNA <br /> project manager or supervisor, with the written approval of a RESNA branch safety officer <br /> or the RESNA Health and Safety Director. <br /> ' FACILITY BACKGROUND <br /> ' One 55Q allonasoline underground storage tank was removed from the property in 1989. <br /> Initial laborator results revealed elevated levels of hydrocarbons remain in the open tank <br /> excavation. <br /> ' FORMS PAGE A-3 DECEMBER 1991 <br />