Laserfiche WebLink
RESNA <br /> EMPLOYEE'S INJURY AND ILLNESS <br /> PREVENTION PROGRAM <br /> SITE SAFETY PLAN <br /> ' Physical Hazards <br /> ' Task(s) Hazard Mitigation Measure <br /> 1 Heavy Equipment (Norse & Physical All heavy equipment used will be in good <br /> ' contact) working order and operated in accordance with <br /> recognized industry standards and CAL-OSHA <br /> Title 8, Subchapter 4, Construction Safety <br /> ' Orders In addition, an exclusion zone applies <br /> to all personnel The exclusion zone will be 20 <br /> feet to the front and either side of the operating <br /> drill rig Personnel will not be allowed under <br /> booms or augers at any time. <br /> All equipment operators and ground crews <br /> working in close proximity of heavy equipment <br /> ' will be supplied with ear protection. <br /> Dust The dust hazard will be mitigated by not <br /> allowing ground crew to be located downwind <br /> ' of drilling and excavation activity. In addition, <br /> water will be applied to control the dust if <br /> visible levels of dust reach the property <br /> boundary. <br /> Fire and Explosion Hazards <br /> List Flammable or Combustible materials on-site Keep sources of ignition away from these materials <br /> ' Flammable (Flash Point c 100 IF) Combustible (Flash Point 0200 °F) <br /> Gasoline Diesel <br /> Type and Location of Fire Extinguishers (Show on map for large projects) <br /> ' One 5 Ib A B C fire extinguisher aboard each Exceltech/RESNAvehicle on-site <br /> t <br /> Other Hazards (Check if applicable) <br />' FORMS .,,PAGE A-5 ... - DECEMBER 1991 <br />