Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for Frontier California Inc . : Manteca CO as of May 01 , 2020 . <br /> Open violations from August 13 , 2019 inspection <br /> Violation #106 - Failed to have an approved UST response plan . <br /> The response plan is not current and/or not approved by the EHD . The response plan must be uploaded to the <br /> California Environmental Reporting System (CERS ) . Immediately log into CERS , upload the completed form , and <br /> submit for review by the EHD . Ensure a copy is available for inspection at any time . <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #121 - Failed to submit a written response within 30 days of receiving an inspection report. <br /> An inspection was last done on 08/02/18 and an inspection report was issued identifying information to be submitted <br /> to bring this site into compliance . This information was required to be submitted by 09/01 /18 . This information was <br /> received on 09/06/18 , 5 days late . An operator that receives an inspection report shall have 30 days to submit a <br /> written response that includes a statement documenting corrective actions taken or proposing corrective actions <br /> which will be taken . Ensure that a written response documenting corrective actions taken or proposed is submitted <br /> within 30 days of receiving an inspection report. <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #124 - " Overfill Prevention Equipment Inspection Report Form " not submitted within 30 days of <br /> inspection . <br /> Overfill prevention testing was performed on 09/13/2018 and a test report was submitted on 10/23/18 , 10 days late . <br /> A copy of the test report must be submitted within 30 days of the tests . Take all necessary precautions to ensure <br /> testing and submittal of test reports are performed in a timely manner. <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Page 1 of 2 <br />