My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 8:37:28 AM
Creation date
6/11/2020 10:12:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> T4:UNLEADED T5:PREMIUM <br /> Tank ID (one OPE per column) <br /> Are both vent and tank riser piping r. Yes r Yes Yes r Yes <br /> secondarily contained? r No r No r No r No <br /> OPE Model OPw oPw <br /> fv Shut off I✓ Shut off r Shut off r Shut off <br /> Flow Flow Flow Flow <br /> r- Restricts r Restricts f Restricts r Restricts <br /> What is the OPE response when activated? Flow Flow Flow Flow <br /> (Check all that apply) r Audible r Audible r Audible r Audible <br /> Alarm Alarm Alarm Alarm <br /> f Visual r- Visual r Visual 7 Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping r Yes* r Yes* r Yes* r Yes* <br /> that may interfere with the OPE operation? r. No r No r No r No <br /> At what level in the tank is the OPE set to 78.875 78.5 <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank at o <br /> which the OPE activates? 93/0 93.3/o <br /> Is the OPE in proper operating condition to r Yes r. Yes r Yes r Yes <br /> respond when the stored substance reaches r No r No r No r No <br /> the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> r: Pass r Pass r Pass Pass <br /> OPE Inspection Results r Fail r Fail r Fail r Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> *Mark here if: <br /> F- Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and !n-Tank Setup report(s) <br />
The URL can be used to link to this page
Your browser does not support the video tag.