My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 8:37:28 AM
Creation date
6/11/2020 10:12:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 SO-TACT PROCEDURE KLOW, <br /> FOR 71 SO-TOOL,SEE PTE S 7150-TOOLCT <br /> FOR 71 WTOOV,SEE PAGE 9 <br /> STEP: WSERT 7150-TOOI.,tT COVER INLET TIUSS <br /> To iwal I the 71 W-'IMLCT(s61d sepmfately)over the <br /> inlet tube,first loosen the thumb screws,so the tool can <br /> pass frecly cvN the inlet tube Range, Align the slot on <br /> circ tool with die Ireyran the inlet tube arta insert the <br /> tool down_ 1-140 Rgum 50c, Tip to stop dine-nstan roust <br /> be 1-3!15" 10 1-1/4' <br /> i,nawn Files a 1C <br /> thumb 'fang tighten STEP 121.; EMLL HOLL5 <br /> suaws Tool Slot tharnh screwy Wrth the inlettube and 71SO-TOU C'T in place,carefully <br /> -. drie a V16'diameter hQ1e i n the upper Tube Lrsing the <br /> : l' , ,. '��••;•�"�~'�<1:-••, tole In the 715O-7'C7QL.C1 4s d gUrrie_ Thedrill STQp is <br /> f' J posidorwd w It will hottcm out agai nst the pool after <br /> the bit has drl IW through the upper drop tube, K the <br /> i step i5 positioned Wrung eit yr no hole wffl be drilled, <br /> uT ora thrqugh hole could potentially he drilled through <br /> ;he►nlec tulx- If no ho►e Is drilled return to Step 1 1C <br /> and check the slop dJmrlon. If a hole is d 61W <br /> J"'/ t' through the Inlet tube or Irtba the view hole the assem- <br /> _ btyr is not s9vagcable. Drift (2}moi a hales in the two <br /> InIrt remaJning guide hoie�. <br /> Tube <br /> Key <br /> NVur*IlC F4yre TPC <br /> �i <br /> SPEP 1 OC: TIGHTEN THE 7*1 S().TO-OLC r <br /> Ensure that the tool seats flat i�galrl:t the top of the;nlet <br /> tube_ 10 pwvent Vftlicaf Muver ont of the tool during Lr „Lm ,qh,,W , qr*y <br /> drll Nang,hand tighten the tbum b Kfews P+gainst the up- <br /> per drop Luba. sto Hgurt I oc'. <br /> I <br /> STW 11 C PREPARE nRlLL AND R1'( <br /> Corthrm that Uw str�-p on thrb 3116"d6il bit£upplled f urs 1X <br /> with the 71 y¢TO]OL T ss in Fh a cc rr4ea pasttlon hefroTe <br /> driWnq, The stop Is factory instal led at a dlslanr i} - <br /> WA-vn 1-3116'tu 1-114"from the ill] with the 71SO- <br /> TOOLCT. If ttw stop is n¢:at the corm[position it must <br /> be fixed tefare drilling_ <br /> CAUTIli w1:Ifthe drlll sttcmp4 nal in tine proper took- <br /> tian failure of a prossum decay leak[est vnay rasuh, <br /> tin <br />
The URL can be used to link to this page
Your browser does not support the video tag.