Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for 7 - ELEVEN INC # 19976 as of May 01 , 2020 . <br /> Open violations from September 05 , 2019 inspection <br /> Violation #105 - Failed to have an approved UST monitoring plan . <br /> The monitoring plans for both tanks incorrectly list the monitoring panel for the tank , piping , and UDC monitoring as <br /> a TLS 350 . The panel on site is a TLS 350 Plus . <br /> The monitoring plan must be uploaded to the California Environmental Reporting System (CERS ) . Immediately log <br /> into CERS , make the necessary changes , and submit for review by the EHD . <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #121 - Failed to submit a written response within 30 days of receiving an inspection report. <br /> An inspection was last done on 9/17/18 and an inspection report was issued identifying information to be submitted <br /> to bring this site into compliance . This information was required to be submitted by 10/17/18 . This information was <br /> not received . An operator that receives an inspection report shall have 30 days to submit a written response that <br /> includes a statement documenting corrective actions taken or proposing corrective actions which will be taken . <br /> Ensure that a written response documenting corrective actions taken or proposed is submitted within 30 days of <br /> receiving an inspection report. <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #124 - " Overfill Prevention Equipment Inspection Report Form " not submitted within 30 days of <br /> inspection . <br /> Overfill prevention testing was performed on October 11 , 2018 and a test report was submitted on January 7 , 20191 <br /> 58 days late . A copy of the test report must be submitted within 30 days of the tests . Take all necessary precautions <br /> to ensure testing and submittal of test reports are performed in a timely manner . <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Page 1 of 2 <br />