Laserfiche WebLink
TANK <br /> NDSTORAGETANK <br /> UNDERGR M CERTIFICATION FORM (Page 4 of 6) <br /> MONITORING SYSTEM <br /> VIII , MONITORING SYSTEM AND PROGRAMMING Y N NA ' <br /> r <br /> ' section must be completed if a monitorin Pane is used to perform leak detection monitorin . <br /> ry r` <br /> This <br /> Are the visual and audible alarms operational? r r r <br /> sensors visually inspected for kinks and breaks i the cables and for residual buildup to ensure that not r <br /> Were all s (� r <br /> containment and positioned so that other equipment <br /> move free) functionally tested , and confirmed oponda na . <br /> Were all sensors installed at lowest point of secondary 1 o r �.- <br /> interfere with their ro er o eration? er settings? r <br /> Was monitoring system set-up reviewed to ensure prop <br /> Was the monitoring p <br /> anel' s backup battery visually inspected , functionally tested , and confirmed operational? r r r" <br /> of fuel stop at the dispenser if a leak is detected in the under-dispentoring syser contai stem fails to operate or is r r r <br /> Does the flow secondary containment moni <br /> Does the turbine automatically shut down if the piping stem detects a leak? r7 (" r <br /> electricall disconnected? in secondary containment monitoring system <br /> Sum f7v Under-dis enser containment I— r <br /> Does the turbine automatically shut down if the pip g operational <br /> Which sensors initiate positive shut down? Check all that a I • modem) op <br /> If alarms are relayed to a remote monitoring station , is all communications equipment (e . g . <br /> of "N " above, describe in section IX how and <br /> when tese S deficiencies were or will be corrected. <br /> For an answer IX, CO <br /> Use this section to provide any additional comments about the inventory of the equipment certified. <br /> X. IN TANK 'GAUGING TESTING Y N NA <br /> Check this box if tank gauging <br /> is used only for inventory control . (Do not complete this section .) <br /> r Check this box if NO tank gauging equipment is installed . (Do not complete this section .) r <br /> This section <br /> must be com leted if in-tank au in is used to perform leak detection a d termination , including r' r <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper en ry <br /> testin for round faults . to ensure that floats move freely , <br /> Were all irkank gauging probes visually inspected for damage and residue buildup r r- r <br /> functionall tested , and confirmed o erational? r r r <br /> Was accuracy of system' s product level readings tested? <br /> system' s water level readings tested? <br /> Was accuracy of <br /> Were all probes reinstalled properly? <br /> t manufacturer' s maintenance checklist completed? <br /> when <br /> Foran answer of "I <br /> Were all items on the equipmendeficiencies were or will be corrected. <br /> above, describe in sect►on XI how andCOMMENTS <br /> provide any additional comments about the inventory of the equipment certified. <br /> Use this section to p <br /> Y = Yes , N = No , NA = Not Applicable <br />