My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 8:37:28 AM
Creation date
6/11/2020 10:12:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPORTANT** Remove all chips and shavings gener- <br /> the tube. DO <br /> Tapeeasure ----- � ... <br /> tr ' t , ated in steps 3 thru 5 out of the cut du <br /> of <br /> th u valve <br /> NOT remove chips and shavings by <br /> body. <br /> l Mark upperTube STEP 4; FILE THE UPPER DROP TUBE <br /> ,,, !,�'- (Cut Line) e, and remove any burrs or <br /> 1,. <br /> File the upper tube squar <br /> • Seam rough edges. Make sure the cut is flat and square . <br /> Figure 2 IMPORTANT: Carefully flue a good chamfer on the <br /> be <br /> inside ed f the dropnlet u installed in Step g-in for the <br /> I provid <br /> STEP 3% CUT THE UPPER DROP TUBE polypak seat <br /> andclamp to the upper tube just <br /> Attach the supplied band <br /> below the mark and ensure that it is assembled square <br /> to the tube. The clamp can be used as a guide for mak- <br /> Ing a square cut, if a vise is used, clamp on the valve <br /> body casting only to avoid damage to the float and <br /> tubes (See Figure 3A)• Carefully saw through the tube <br /> squarely, at the mark made in Step 2. Use a hacksaw <br /> with a new fine-tooth blade. Rotating the upper <br /> as the sawing progressses�iiiminimize he band clamp run out and <br /> sure a square 90-deg <br /> after tube Is cut. <br /> CAUTI - DO NOT use a pipe or tubing cutter to cat Fine half round file <br /> OPOOPPOP <br /> the upper drop tube, this may damage the tube, <br /> causing it to be out of round thereby prohibiting <br /> assembly of the unit . <br /> Figure 4 <br /> STEP S; SAND THE UPPER DROP TUBE <br /> Sand the inside of the drop tube with sandpaepers. aftedr/or <br /> steel wool to remove <br /> the inside o burrs fhe tubsharp edwith a clean <br /> VIVOr sanding wipe d <br /> �• ` rag from the top to approximately 4 inches dawn to <br /> remove any debris& <br /> f chamfer, sand, and <br /> i <br /> _ tion: Failure to properly <br /> - clean the drop tube may cut the seal and result In a <br /> .t failure of a pressure decay leak test. <br /> i <br /> Figure 3A iPON � <br /> ; <br /> /InaBand CiamP -r � e� gtft 9andpeoer <br /> Figure S <br /> Cut line f <br /> Figure 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.