My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 8:37:28 AM
Creation date
6/11/2020 10:12:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIEMENS MISS PURE BELOW. STEP 11 B: PREPARE DRILL AND SIT <br /> LFOR <br /> TQOLC PROLE <br /> Confirm that the stop on the 3/16° drill bit supplied <br /> 15p-'POOL, 5EE PAGE 8 with the 7150T00LC isinthe correct position before <br /> 1 SO-TOOLCT, SEE PAGE 1 drilling, l he stop Is factory In <br /> at a distance be- <br /> can only be used with testable TOOLtween 1 "I the stothe 71 SO <br /> p is n'ot at the correct from the tvp with <br /> tion t must <br /> Mote: 71St)-TUOI.0 TogLC. If P <br /> overfill valves if modified as shown below be fixed before drillingt proper loca- <br /> CAUIION: If the drill stop is notlQak test m result# <br /> r tion failure of a pressure% decay <br /> ru E 71SO- <br /> il � <br /> iroOLC, <br /> t �.. <br /> . <br /> s <br /> dimension must <br /> Add a 10-24 UNC thread or similar Tip to stop bel -3/ 16 to <br /> 14" <br /> to all three legs of the 715Q- <br /> 3 - 1 <br /> TOOLC In the area shown. Use set Irlgure 71B <br /> screws to secure tool to upper <br /> tube. STEP 126: DRILL HOLES <br /> Testable Inlet With the inset tube and 715U-TOQt..C � ulbe using the - <br /> 71 SO-TOtILCModifications fordrill a 3/ 16" diameter hole in the upp <br /> OVER INLET TUBE hole in the 71 SO 70QI-C as a quiheeThe tolo! after the <br /> STEP 9B: INSERT 71SO-'TOOLC O sitioned so it will bottom out against drop tube !f the stop <br /> To install the 7150-T�01 C (sold separately) over the bit has drilled through the upper <br /> is positioned wrong either no hole will be drilled, or a <br /> inlet tube, first loosen the thumb screw, so the tool can through hole could potentially be drilled through the <br /> pass freely over the inlet tube flange. Align the slot on ube. If no hale is drilled return to step 1 i and <br /> the tool with the key on the inlet tube and insert the inlet t <br /> tool down. See Figure 98. check the stop dimension , if a hole is drilled through <br /> Hand tighten thumb screw the inlet tube or into the screw hole the assembly is not <br /> Tool Slot Drill (2) more holes in the two remaining <br /> salvageable. <br /> o guide holes. <br /> © <> ca <br /> Q <br /> Loosen <br /> thumb O <br /> screw L7 <br /> Met <br /> Tube <br /> Key <br /> p6p tluough upper tube onfY <br /> pi�e+re Y ?B <br /> STEP 1 o6: TIGHTEN THE 71 SO40OLC of the inlet <br /> Ensure that the tool seats flat against the top <br /> tube. To prevent vertical movement gain� during <br /> drilling, hand tighten the thumb screw theup- <br /> per drop tube. See V1 Jure ��$' <br />
The URL can be used to link to this page
Your browser does not support the video tag.