My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 8:37:28 AM
Creation date
6/11/2020 10:12:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 15: DIMPLE REMAININGG HOLES <br /> STEP 13: DIMPLE FIRST HOLE 13. Make sure <br /> Remove tool . Remove any chips or burrs from the drill- Remove <br /> Dimple the next (2) holes as done l in Step g operations <br /> Remo D p After <br /> Ing operation. Place the assembly on a solid surface. the assembly is on a solid surface when <br /> fallen into <br /> Using the punch supplied with the 71 SO-TOOL, 71 SO- unchin remove any chips that may <br /> TOOLC, and 7150 TOOLCT, align the tip f the <br /> ap tube by nch he Inlet tube screw hole# <br /> with the drilled hole and dimple the upper <br /> striking the punch with a hammer until the drop tube is <br /> formeds After <br /> punching, move countany chips that may have fsunk hole in the inlet allen into <br /> punching, • <br /> the inlet tube screw hole. <br /> Align punch with <br /> I drilled hole <br /> Figure 15 <br /> m STEP 16: ASSEMBLE OTHER SCREWS <br /> Apply black molt' grease to screws and tighten the oth- <br /> er (2) screws into inlet tube with a screwdriver as done <br /> in Step 14. Use only the taptite screws that are supeied <br /> Figure 13 it <br /> lbs max, Do not over tigh the unit. Seating torque Is 20 in-lbs min. to 35 in- <br /> STEP 14: ASSEMBLE FIRST SCREW <br /> Ensure that the drop tube was formed into the counter- STEP 17: APPLY GREASE TO LOWER O-RING AND <br /> sunk screw hole as shown In Figure 14 if not return to BODY THREADS <br /> Step 13, Apply black moly grease to screw and tighten Apply black molt' grease to the Lower tube o-ring and <br /> first screw into inlet tube with a screwdriver. Use only rin Install o-ring in groove just <br /> #a tite screws that are supplied with the unit. Seatd bie Qthreads nd the cr shown . g Oke sure coverage is ve ) <br /> thep <br /> Ingstorque is 201n4bs hould beflu h with the� drop tube,lbDo not over Screw <br /> ghta above threads. <br /> e ApplYgrease <br /> en. <br /> around trring <br /> Ensure the drop tube Is formed Into <br /> wuntetnkhola <br /> O-ring <br /> groove godythreads <br /> Figure 14 Figure 17 <br /> R E OIL <br /> 11 <br /> ZOZO <br /> ENVIRONMENTAL HEALTH <br />
The URL can be used to link to this page
Your browser does not support the video tag.