Laserfiche WebLink
IVED <br /> z , I , ,. <br /> swxcB, January 2002 � U C 0 6 Z 020 Page 1 of 1 <br /> 5 . SECONDARY PIPE TESTING <br /> Test Method Developed By : Piping Manufacturer Industry Standard Professional Engineer <br /> f-" <br /> Other (Specify) ENVIRONMENTAL HEALTH <br /> Test Method Used By : F Pressure F' Vacuum I` ydrostatic ' <br /> F Other (Specify) <br /> Test Equipment Used : gauge Equipment Resolution : .20 <br /> (Tank T4:UNLEADED (Tank T5 :PREMIDM <br /> - RUL) STP PUL) STP Containment <br /> Containment 1 to 1/2 1 to 1/2, 3/4 <br /> Piping Material: 3/4 dw fiberglass <br /> Piping Manufacturer: dw fiberglass smith <br /> Piping Diameter: smith 3 in , in. in. <br /> Length of Piping Run : 3 in. 90 ft ft. ft. <br /> Product Stored : 90 $. PUL <br /> Method and location of RUL <br /> sump <br /> pi in run isolation : <br /> sump <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min min min <br /> starting test: 15 min <br /> Test Start Time: 09:26:00 <br /> Initial Reading (Rt): 09:26:005400000 PSI <br /> Test End Time : 5.00000 PSI 10:26:00 <br /> Final Reading10:26:00 <br /> (R 5.00000 PSI <br /> F)� <br /> Test Duration : 5.00000 PSI I hr <br /> Change in Reading (RF-RI): 1 0.00000 PSI <br /> Pass/Fail Threshold or 0.00000 PSI <br /> +/- 0.00000 +/- +/- <br /> Criteria: +/- 0. 00000 <br /> Test Result Pass <br /> • Pass <br /> Comments - (include information on repairs made prior to testing, and recommended follow- aap for• failed tests) <br /> W0 : 2345875 <br />