My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 8:37:28 AM
Creation date
6/11/2020 10:12:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JAAHS H. RAY <br /> CIVIL ENGINEER <br /> 2441 Hidden Valley Drive <br /> Santa Rosa. CA 995404 <br /> 7474804115 <br /> NOVEMBER 169 2001 <br /> REVISED: AUGUST 1, 2004 <br /> Tanknology Inc <br /> 8501 N. MoPac Expressway, Suite 400 <br /> Austin, TX 78759 <br /> A.TT : Bract Hoffman <br /> RE : STATE PRVESSIONAI, F,NGINKER APPROVAL <br /> CHAPTER 6.7 H&SC, SECTION 2635(b) <br /> CCR Title 23, Division 23, Chapter 16, Section 2635 (b) <br /> PERIODIC TESTING OF SPILT. CONTAINERS, UNDER-DISPENSER <br /> CONTAINMENT AND SUBMERGED TURBINE E PUMP SUMPS WITH <br /> COMPUTERIZED VPLT <br /> I have reviewed and evaluated the following materials for the periodic testing of Spill <br /> Containem/Containment. <br /> 1 . CCR Title 23 , Division 3 , Chapter 16, Underground Tank Regulations. <br /> 2. Chapter 6.7 H & S Code, Underground Storage of Hazardous Substances . <br /> 3 . Evaluation of the VPLT Underfill Tank Tightness Testing System prepared for <br /> NDE, Environmental Corporation by Ken Wilcox Associates, Inc., Blue Springs, <br /> Mo, dated March 30, 1. 993 . <br /> 4. LO 1. 1344 Tw*aolowywNDE Computeriaed 'VPLT Tosting System, 'Volumewc <br /> Tank Tightness Test Method (Underfill). Evaluator. Ken Wilcox Associates, date <br /> of evaluation 02/15/93 <br /> 5 . Tanknology summary 'V'PLT TESTING SYSTEM Rev. 8/01 /01 <br /> 6. Study by Brad Hoffman, Tan4mology, comparing VPLT test times for <br /> underground storage tanks and various sumps based on volume, time and surface <br /> area parameters. The minimum test times are 30 minutes for STP sumps and large <br /> fill sump, 15 minutes for UnderwDispenser Containment sumps, and 10 minutes <br /> for Spill Containers. <br /> 6a VPLT sysumi sufl.ware is capable ofoperwing with variom ftusholds and test <br /> periods in order to detennine the pass/fail rate. The minimum standard test period <br /> is 10 minutes and. the maximum volume change is 0 .05gph. The test period may <br /> he extended and the threshold may be modified as required by customer and/or <br /> PACE 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.