My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1580
>
2300 - Underground Storage Tank Program
>
PR0231476
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 4:13:52 PM
Creation date
6/11/2020 10:35:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231476
PE
2361
FACILITY_ID
FA0000684
FACILITY_NAME
QUIK STOP MARKET #125
STREET_NUMBER
1580
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
259-090-21
CURRENT_STATUS
01
SITE_LOCATION
1580 W MAIN ST
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUNDSTORAGETANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page 5 of s) <br />XII. LINE LEAK DETECTOR TESTING <br />❑ Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) Y <br />This section must be completed if LLDs are installed. <br />N NA <br />Was a leak simulated to verify LLD performance? X <br />(Check all that apply.) Simulated leak rate verified: ❑X 3 GPH ❑ 0.1 GPH ❑ 0.2 GPH <br />El El <br />Was the testing apparatus properly calibrated? ❑X <br />❑ ❑ <br />For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? ❑ <br />❑ X❑ <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? ❑X <br />❑ ❑ <br />For electronic LLDs, does the turbine automatically shut off when a leak is detected? ❑ <br />❑ ❑X <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑ <br />❑ X❑ <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑ <br />❑ X❑ <br />For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? ❑ <br />❑ X❑ <br />Were all items on the equipment manufacturer's maintenance checklist completed? ❑X <br />❑ ❑ <br />Were all LLDs confirmed operational within regulatory requirements? ❑X <br />❑ I ❑ <br />For any answer of "N" above, describe in Section Xlll how and when these issues were or will be corrected. <br />XIII. COMMENTS <br />XIV. VACUUM / PRESSURE / HYDROSTATIC MONITORING EQUIPMENT TESTING <br />❑X Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br />This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br />System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br />Sensor ID Component(S) Monitored By This Sensor Sensor Functionality Interstitial Communication <br />Test Test <br />❑ Pass ❑ Fail ❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail ❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail ❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail ❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail ❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail ❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail ❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail ❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail ❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail ❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail ❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail ❑ Pass <br />❑ Fail <br />How was interstitial communication verified? ❑ Simulated Leak at Far Ends of the Interstitial Space ❑ Visual Inspection <br />❑ Other Describe the method in section XV below. ❑ Gauge <br />Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑ Yes ❑ No (Describe the reason in section XV below.) <br />For any answer of "Fail' above, describe in Section XV how and when these issues were or will be corrected. <br />XV. COMMENTS <br />RECE..�,IVED <br />JUN 18 2020 <br />ENVIRONMENTAL HEALTH <br />DEPARTMENT <br />GPH = Gallons Per Hour, Y = Yes, N = No, NA= Not Applicable, VPH = Vacuum/PressureMydrostatic, ID = Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.