Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />SECONDARY CONTAINMENT TESTING REPORT FORM (Page 1 of 6) <br />Type of Action ❑ Installation Test ❑ Repair Test ❑ Six Month Test 0 36 Month Test <br />I. FACILITY INFORMATION <br />CERS ID <br />10180643 <br />Date of Secondary Containment Test <br />8/8/2020 <br />Business Name (Same as Facility Name or DBA -Doing Business As) <br />Quik Stop #125 <br />Business Site Address <br />1580 W. Main St <br />City <br />Ripon <br />ZIP Code <br />95366 <br />II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br />Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification) <br />Juan Jauregui <br />[P—hone# <br />(916) 372-1888 <br />Contractor / Tank Tester License # <br />617238 <br />ICC Certification # <br />5246964 <br />ICC Certification Expiration Date <br />8/30/2019 <br />III. SUMMARY OF SECONDARY CONTAINMENT TESTING RESULTS <br />TANK ID: (By tank number, stored product, etc.) <br />A Gasoline - 87 <br />B Gasoline - 91 <br />C Diesel <br />D <br />Tank Containment <br />Tightness Test Result <br />O Pass ❑ Fail ❑ NA <br />O Pass ❑ Fail ❑ NA <br />E Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />Product Piping Containment <br />Tightness Test Result <br />E Pass ❑ Fail ❑ NA <br />E Pass ❑ Fail ❑ NA <br />E Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />Communication Test Result <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail ❑ NA <br />Remote Fill Piping Containment <br />Tightness Test Result <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail O NA <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail ❑ NA <br />Communication Test Result <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail ❑ NA <br />Vent Piping Containment <br />Tightness Test Result <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail ❑ NA <br />Communication Test Result <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail ❑ NA <br />Vapor Recovery Piping Containment <br />Tightness Test Result <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail ❑ NA <br />Communication Test Result <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail ❑ NA <br />Turbine / Product Piping Sump <br />Tightness Test Result <br />E Pass ❑ Fail ❑ NA <br />E Pass ❑ Fail ❑ NA <br />E Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />Fill Riser Sump <br />Tightness Test Result <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail E NA <br />❑ Pass ❑ Fail ❑ NA <br />VENT I TRANSITION SUMP ID: <br />a <br />b <br />c <br />d <br />Tightness Test Result <br />❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />UDC ID: <br />1 Disp #1-2 <br />2 Disp #3-4 <br />3 Disp #5-6 <br />4 <br />Tightness Test Result <br />E Pass ❑ Fail ❑ NA <br />E Pass ❑ Fail ❑ NA <br />E Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />UDC ID: <br />5 <br />6 <br />7 <br />8 <br />Tightness Test Result <br />❑Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />UDC ID: <br />9 <br />10 <br />11 <br />12 <br />Tightness Test Result <br />❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />I ❑ Pass ❑ Fail ❑ NA <br />All items marked "Fail" or "NA" must be explained in their respective "COMMENTS" section. <br />IV. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br />I hereby certify that the secondary containment was tested in accordance with California Code of Regulations, Title 23, Division <br />3, Chapter 16, Section 2637 and all the information contained herein is accurate. <br />UST Service Technician Signature <br />CERS = California Environmental Reporting System, IdentificationvUST = Underground Storage Tank, ICC = International Code Council, NA = Not Applicable, UDC = Under - <br />Dispenser Containment <br />