My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1580
>
2300 - Underground Storage Tank Program
>
PR0231476
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 4:13:52 PM
Creation date
6/11/2020 10:35:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231476
PE
2361
FACILITY_ID
FA0000684
FACILITY_NAME
QUIK STOP MARKET #125
STREET_NUMBER
1580
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
259-090-21
CURRENT_STATUS
01
SITE_LOCATION
1580 W MAIN ST
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />SECONDARY CONTAINMENT TESTING REPORT FORM (Page 5 of 6) <br />XVII. FILL RISER SUMP TESTING INFORMATION <br />Manufacturer Identify Tank ID from Section III for each Manufacturer <br />A❑ I B <br />1 C❑ <br />D❑ <br />A❑ I B❑ <br />I C❑ <br />I D❑ <br />Test Method Used: <br />❑ Manufacturer Guidelines (Specify): <br />❑ Industry Code or Engineering Standard (Specify): <br />❑ Engineered Method (Specify): <br /># of Attached Pages <br />Attach the testing procedures and all documentation required to determine the results. <br />Fill Riser Sump Testing Training and Certifications (List applicable certifications.) <br />Expiration Date <br />XVIII. COMMENTS <br />Provide any additional comments here. <br />XIX. VENT / TRANSITION SUMP TESTING INFORMATION <br />Manufacturer Identify Vent / Transition Sump ID from Section III for each Manufacturer <br />a❑ I b❑ <br />C <br />d❑ <br />a❑ I b❑ <br />I C <br />1 d❑ <br />Test Method Used: <br />❑ Manufacturer Guidelines (Specify): <br />❑ Industry Code or Engineering Standard (Specify): <br />❑ Engineered Method (Specify): <br /># <br />Attach the testing procedures and all documentation required to determine the results. <br />of Attached Pages <br />Vent I Transition Sump Testing Training and Certifications (List applicable certifications.) <br />Expiration Date <br />XX. COMMENTS <br />Provide any additional comments here. <br />ID = Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.