SAN JOARU <br />.�_,u;� I <br />Environmental Health Department <br />Underground Storage Tank Program Inspection Report <br />Facility Name: <br />Facility Address: <br />Date: <br />QUIK STOP MARKET #3125 <br />1580 W MAIN ST, RIPON <br />June 03, 2020 <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />Item # <br />Remarks <br />209 <br />CCR 2716(a -e) Failure to conduct the designated UST operator visual inspection at least once every 30 days. <br />1) OBSERVATION: The designated operator inspections for the following months were performed more than 30 <br />days after the previous inspection: <br />- Initial inspection on 8/26/2019, next inspection performed on 9/27/2019, 32 days later <br />- Initial inspection on 9/27/2019, next inspection performed on 10/28/2019, 31 days later <br />REGULATION GUIDANCE: The designated operator visual inspections shall be conducted within 30 days or less of <br />the previous inspection. <br />CORRECTIVE ACTION: Ensure that all designated operator inspections are performed within the required time <br />frames. <br />2) OBSERVATION: The designated operator failed to check and note the correct test dates for the secondary <br />containment testing on the 8/26/2019 designated operator inspection report. Secondary containment was completed <br />on 8/8/2019. <br />REGULATION GUIDANCE: During the inspection, the designated operator shall check that all required testing and <br />maintenance for the UST system have been completed and document the dates they were done. <br />CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of <br />the required information on the reports. <br />3) OBSERVATION: Designated operator reports were not signed within the required time frame. <br />-The designated operator reports were not signed by the owner/operator. <br />REGULATORY GUIDANCE: Within 48 hours of the completion of the designated UST operator visual inspection, <br />the designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 48 <br />hours of being provided a signed copy of the report, the owner or operator shall provide a description of each <br />corrective action taken or to be taken and shall sign and date the report, acknowledging the identified compliance <br />issues. <br />CORRECTIVE ACTION: Ensure all designated operator inspection reports are completed and signed within the <br />required time frame in the future. <br />4) OBSERVATION: The designated operator failed to check and note all required items on the visual inspection <br />reports. The incorrect and missing information included the following from the inspection reports: <br />- The "NA" in sections VII through XI were not explained. <br />-Missing UST owner/operator's response in section III <br />-Missing CERS ID <br />-The 9/27/2019 report had the wrong monthly inspection date. <br />REGULATION GUIDANCE: During the visual inspection, the designated operator shall check that all required <br />FA0000684 PR0231476 SCO01 06/03/2020 <br />EHD 23-01 Rev. 9/20/2019 Page 6 of 8 Underground Storage Tank Program OIR <br />1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />