Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: <br /> If you already have a site plan that shows all required information,you may include it rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring dank <br /> annular spaces or vault,'4)devices monitoring product piping;5)devices monitoring fill piping;6)deviclrnonit I g vent piping;7)devices <br /> monitoring vapor recovery piping;8) devices monitoring vent/transition sumps;9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors;and 11)devices monitoring any other secondary containment areas. <br /> MorAwling System Certification .THIN 1G b 6211 <br /> UST Monitoring Site Plan G <br /> --------------------------------------------------------------------------------------------- <br /> ENIR�")NMENTP,�HEALTH <br /> RIPON SHELL 341 MAIN STREET RIPON CA 95388 ENT <br /> Dravvg of piping <br /> . - mt c2&=p and <br /> LDC's.\o <br /> . ui de .ound <br /> . dram is wettrate. <br /> .e rot <br /> . - specdau blin <br /> : : : : : : ❑ x . : . x . : : fes-- J <br /> r <br /> x <br /> s F t' P . . . . . . . . . <br /> L x <br /> KEY _ <br /> A=:L\1Z2AR <br /> F–FILLS - STORE <br /> T=TL-RBI\E <br /> P=PROBE <br /> V=VAPOR _ <br /> S=SUNIP SF_NSOR <br /> L=LD _ <br /> B=Brine Sensor <br /> I=S-1 Sensor <br /> S=STP _ <br /> C-Floats f Cha;", _ . . . . . . . . . . . <br /> E–E stop . . . . . . . . . . . . . . . . <br /> dpZtorad the are na visible to rho cerrjf,-,ir rac7sncian are a . <br /> . <br /> L_�IFIE_17111 <br /> Dril <br /> Date map as drawn jQdQf <br /> Instructions <br /> If you already have a diag em that shows all required information.you may in Duce a.rather than this page,with your Monitoring System ClsOcation. On your site plan. <br /> show the genera,layout of tanks and picirg.Clearly identify loc ihors of the following equipment,if installed monao-l;system ront cl parels;sensors monaonrg tank <br /> annular spaces,s,mpa.dispenser pans.spill containers•or other sexndary containment areas me:har.iul cr ekrronc line leak detectors;and in-lank liquid levei <br /> c rohes(d used fcr eak detectcn). h the space provided,note the date this Ste Pan was prepared. <br /> LEGEND <br />