My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
2300 - Underground Storage Tank Program
>
PR0231487
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2020 2:35:39 PM
Creation date
6/11/2020 10:43:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231487
PE
2351
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Esclon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22510003
CURRENT_STATUS
01
SITE_LOCATION
1329 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at UST Facilitie <br /> NOTE: If the fill cap is not included in the the spill bucket.The vacuum level is monitored foi <br /> spill bucket test and/or the cap is not tight, it a 1-minute period. <br /> could be the source of potential fuel contami- 6.3.3 Test Equipment. Test equipment shal <br /> nation from water intrusion. <br /> .:. include: <br /> NOTE: Before permanelrtly plugging, ensure vacuum test apparatus (The test apparatus mai <br /> that local regulations allow the drain valve to be available from the spill bucket manufacturer <br /> be permanently plugged. It includes an air pressure regulator, a vacuurr <br /> - . . . source, a vacuum gauge with a minimum 0-5C <br /> inch water column range and a control valve <br /> 6.2.5 Test Procedure. The control valve is used to adjust the vacuurr <br /> 1. Add water to the spill bucket to a level within level.); <br /> 1.5 inches of the top of the spill bucket. Allow ° test cover(The cover is equipped with a test fit• <br /> the water to settle for 5 minutes before the initial ting.); <br /> water level measurement is taken. <br /> 2. Place the measuring stick vertically at the lowest plumber's plug(appropriate size, if used); <br /> point in the spill bucket and extending above the ° stopwatch or other time-measurement device <br /> water level to allow for an accurate measure- capable of measuring a 1-second increment; <br /> ment to be taken.The location of the measuring ° gasketing material (The purpose of the gas- <br /> stick must remain the same for each water level keting material is to provide an air-tight sea: <br /> measurement. Document the initial water level between the test cover and the spill bucket.). <br /> measurement as measured from the bottom of <br /> the spill bucket.Alternative measurement meth- o-50-water column <br /> ods may be used provided that measurement to Vacuum Vacuum Gauge <br /> 1/16(0.063) inch can be made. source is <br /> 3.Take all precautions to prevent the water level <br /> from being; disturbed during the duration of the control <br /> test. <br /> Valve <br /> 4.After 1 hour, document the ending water level <br /> measurement. <br /> 5.Upon completion of the test, remove and dis- <br /> pose of the water according to Section 6.7, and <br /> dry the inside of the spill bucket before returning ' Plumber's Plug In <br /> it to service. Tank Riser Pipe <br /> 6.2.6 Pass/Fall Criteria. If the water level has <br /> dropped less than 1/8 (0.125) inch,the spill bucket <br /> passes the integrity test. <br /> If the water level has dropped 1/8 (0.125) inch or <br /> greater, the spill bucket fails the integrity test. <br /> 6.3 Spill Bucket Integrity Testing — Vacuum Test FIGURE,6-2. The cover must make a tight seal with the <br /> Method. spill bucket to prevent leakage when the vacuum is <br /> 6.3.1 Purpose. This method is used to test the pulled during the test. <br /> integrity of single-walled spill buckets or the pr-i- <br /> maty containment of secondarily contained spill <br /> buckets. alUse only an air-operated vac- <br /> uum source or a vacuum pump pow- <br /> 6.3.2 Description of Test. Usin 'specially (W bred by an explosion-proof motor. Vacuum <br /> equipped test cover, a partial vacuum is aPP li,e, ,d to- .3 202 pumps with electric motors that are not <br /> , <br /> ENVIRONMENTAL HEALTH pei.org <br /> DEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.