My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 4:40:58 PM
Creation date
6/11/2020 11:23:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tape measure IMPORTANT: Remove all chipA.4 sb" AWPAenerated <br />in steps 3 thru 5 out of the cut end of the tube. DO NOT <br />remove chips and sh"fftor 0ArP*' tTH <br />body. DEPARTMENT <br />Mark Upper Tube <br />(Cut Line) <br />Seam <br />Figure 2 <br />STEP 3: CUT THE UPPER DROP TUBE <br />Attach the supplied band clamp to the upper tube just <br />below the mark and ensure that it is assembled square <br />to the tube. The clamp can be used as a guide for mak- <br />ing a square cut. If a vise is used, clamp on the valve <br />body casting only to avoid damage to the float and <br />tubes (See Figure 3A). Carefully saw through the tube <br />squarely, at the mark made in Step 2. Use a hacksaw <br />with a new fine-tooth blade. Rotating the upper tube <br />as the sawing progresses will minimize run out and en- <br />sure a square 90 -degree cut. Remove the band clamp <br />after tube is cut. <br />CAUTION - DO NOT use a pipe or tubing cutter to cut <br />the upper drop tube, this may damage the tube, <br />causing it to be out of round thereby prohibiting <br />assembly of the unit. <br />Figure am <br />Figure 3B <br />STEP 4: FILE THE UPPER DROP TUBE <br />File the upper tube square, and remove any burrs or <br />rough edges. Make sure the cut is flat and square. <br />IMPORTANT: Carefully file a good chamfer on the in- <br />side edge of the drop tube to provide a lead-in for the <br />polypak seal and inlet tube installed in Step 8. <br />Figure 4 <br />STEP 5: SAND THE UPPER DROP TUBE <br />Sand the inside of the drop tube with sandpaper and/or <br />steel wool to remove all burrs and sharp edges. After <br />sanding wipe down the inside of the tube with a clean <br />rag from the top to approximately 4 inches down to <br />remove any debris. <br />Caution: Failure to properly chamfer, sand, and <br />clean the drop tube may cut the seal and result in a <br />failure of a pressure decay leak test. <br />Figure 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.