My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007371 CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
30350
>
2900 - Site Mitigation Program
>
PR0540424
>
ARCHIVED REPORTS_XR0007371 CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 12:44:55 PM
Creation date
6/11/2020 12:07:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007371 CASE 2
RECORD_ID
PR0540424
PE
2960
FACILITY_ID
FA0023098
FACILITY_NAME
RMC PACIFIC MATERIALS - T0607700371
STREET_NUMBER
30350
Direction
S
STREET_NAME
TRACY
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
30350 S TRACY
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GROUNDWATER MONITOR WELLS <br /> . SECOND QUARTER 2005 MONITORING REPORT <br /> RMC PACIFIC MATERIALS -KERLINGER AGGREGATE FACILITY <br /> 30350 South Tracy Boulevard, Tracy, California <br /> San Joaquin County Site #1737 <br /> INTRODUCTION <br /> This report presents the Second Quarter 2005 results of groundwater monitoring-well <br /> samplings undertaken on August 26, 2005 by RMC PACIFIC MATERIALS (RMC) at the <br /> above-referenced property The report describes the sampling protocol utilized, the results of <br /> laboratory analyses on the water samples, and a discussion of the findings to date <br /> MONITORING PROTOCOL <br /> The sampling and analyses of the groundwater monitoring wells were undertaken in <br /> accordance with the sampling requirements delineated by the San Joaquin County Environmental <br /> Health Department (EHD) in their November 6, 2003 letter to RMC The sampling process used <br /> in groundwater monitoring wells MW-04, MW-05, MW-06, MW-07 and MW-08 was as <br /> follows <br /> • • The well caps were removed prior to measurement and sampling to allow equilibrium <br /> with atmospheric pressure <br /> • Depth-to-water measurements were made using an electronic water tape and recorded on <br /> field sheets (Table 1, field sheets in Appendix 2) The depth-to-water measurements were <br /> also used to determine if the groundwater gradient among the wells had changed since the <br /> wells were last sampled ;n March 2005 <br /> • The volume of water in each well was calculated in the field using the measured depths- <br /> to-water <br /> lu <br /> • The wells were purged of two casing vomes of water using the dedicated bladder <br /> pumps in each well <br /> • Field readings were taken at approximately three-gallon intervals to monitor the pH, <br /> temperature and conductivity of the extracted water (Appendix B) <br /> • Groundwater samples were collected into laboratory-supplied 40-m1 VOA-vial sample <br /> containers <br /> The sample containers were properly labeled, placed into a cool icechest and transported <br /> under strict chain-of-custody documentation to Severn Trent Laboratory (STL) m <br /> Pleasanton, California for analysis <br /> • The samples were analyzed by EPA method 8015M for diesel range petroleum <br /> hydrocarbons (TPH-diesel) and by EPA method 8021B for benzene, toluene, ethyl <br /> benzene, and xylenes (BTEX) and for methyl tertiary-butyl ether (MTBE) <br /> • <br /> Quarter 2 Sampling Report-2005 <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.