My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012799 CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
30350
>
2900 - Site Mitigation Program
>
PR0540424
>
ARCHIVED REPORTS_XR0012799 CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 12:31:26 PM
Creation date
6/11/2020 12:08:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012799 CASE 2
RECORD_ID
PR0540424
PE
2960
FACILITY_ID
FA0023098
FACILITY_NAME
RMC PACIFIC MATERIALS - T0607700371
STREET_NUMBER
30350
Direction
S
STREET_NAME
TRACY
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
30350 S TRACY
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RMC PACIFIC MATERIALS <br /> . www rmcpacrfic com <br /> g/19/2oa3 <br /> Jeffery Wong, REHS <br /> Public Health Services of 15 h� Ez U <br /> San Joaquin County <br /> 304 East Weber Avenue, 3rd Floor AUG 2 0 2003 <br /> Stockton, CA 95202 <br /> ENVIRONMENT HEALTH <br /> PERMIT/SERVICES <br /> RE; RMC Pacific Materials; Kerlinger Aggregate Plant <br /> First Quarter 2003 Sampling Report <br /> 30350 South Tracy Boulevard, Tracy, CA. <br /> San Joaquin County Site#1737 <br /> Mr Wong, <br /> Please find enclosed with this letter our submittal of the First Quarter Groundwater <br /> Monitoring Report for the above-referenced facility Sampling of the three-groundwater <br /> monitoring wells was undertaken on July 16`h and 17`h, 2003 This sampling was <br /> completed just prior to a meeting on Monday July 21" between the San Joaquin County <br /> Environmental Health Services Department (Department) and RMC Pacific Materials <br /> • (RMC) at the site As a follow-up to that meeting 1 will also be submitting our work plan <br /> /proposal for subsequent sampling at the site <br /> I look forward to receiving your response to our report and the forthcoming plan <br /> proposal <br /> Robert Aldenhuysen <br /> Environmental Supervisor <br /> Enc <br /> Cc G Brown <br /> D Tsuchida <br /> Files <br /> .r <br />
The URL can be used to link to this page
Your browser does not support the video tag.