My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009234
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TILLIE LEWIS
>
1444
>
2900 - Site Mitigation Program
>
PR0540506
>
ARCHIVED REPORTS_XR0009234
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 12:28:43 PM
Creation date
6/11/2020 12:25:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009234
RECORD_ID
PR0540506
PE
2950
FACILITY_ID
FA0023166
FACILITY_NAME
MONBERG PROPERTY
STREET_NUMBER
1444
STREET_NAME
TILLIE LEWIS
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16335003
CURRENT_STATUS
01
SITE_LOCATION
1444 TILLIE LEWIS DR
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will be decontaminated prior to commencing drilling at each <br /> hole . Well construction materials will be cleaned as <br /> necessary, prior to installation. <br /> Equipment and well material decontamination will be <br /> ' conducted on an impermeable surface and all decontamination <br /> effluent will be contained. All surfaces of the equipment <br /> will be thoroughly decontaminated using a steam cleaner. <br /> The equipment will be placed on a drying rack for air <br /> drying. The decontamination water will stored in containers <br /> certified for hazardous materials storage and disposed of in <br /> ' an approved manner. <br /> Sample equipment to be used for pesticides and organic <br /> analysis will be washed in a nonphosphate detergent (Alconox <br /> 1 or equivalent ) and rinsed with tap water, followed by <br /> deionized water and finally with acetone. If the equipment <br /> is for metals analysis, the initial rinse will be conducted <br /> 1 with 0.1 N nitric acid followed by tap water and deionized <br /> water. <br /> ' 7.0 Field Equipment Calibration and Maintenance <br /> The following measuring equipment may be used during the <br /> Remedial Investigation. Equipment is grouped by field <br /> activity. Calibration procedures and frequency are listed <br /> for each piece. <br /> Soil Borings and Well Dimensions-Steel and coated cloth <br /> tape. Calibration: none. <br /> Water Level Measurements in Wells- Steel surveyors tape. <br /> Calibration: manufacturer supplied temperature correction <br /> will be applied as applicable for field conditions . <br /> Electrical well sounders. Calibration: check against steel <br /> ' surveyor' s tape. <br /> Organic Vapors- Photoionization detector. Calibration: <br /> Daily field Calibration using a isobutylene standard as per <br /> manufacturers instructions. <br /> Groundwater pH Measurement- Digital pH meter. Calibration: <br /> ' standard pH solutions of 4, 7, and 10 will be utilized for <br /> daily field calibration according to manufacturers <br /> instructions. <br /> Electrical _Conductivity- Electrical conductivity meter. <br /> Calibration: factory-calibrated annually and periodically <br /> calibrated against laboratory prepared standard calibration <br /> solution. <br /> Water Temperature- Mercury or digital thermometers . <br /> Calibration: factory-calibrated once. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.