My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009234
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TILLIE LEWIS
>
1444
>
2900 - Site Mitigation Program
>
PR0540506
>
ARCHIVED REPORTS_XR0009234
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 12:28:43 PM
Creation date
6/11/2020 12:25:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009234
RECORD_ID
PR0540506
PE
2950
FACILITY_ID
FA0023166
FACILITY_NAME
MONBERG PROPERTY
STREET_NUMBER
1444
STREET_NAME
TILLIE LEWIS
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16335003
CURRENT_STATUS
01
SITE_LOCATION
1444 TILLIE LEWIS DR
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Volume of ace Open Borehole and Annular Space <br /> P <br /> Between Casing and Hole <br /> Volume/ Volume/ <br /> ' Hole linear ft. Nominal linear £t. of* <br /> Diameter of hole Casing Diameter Annular Space <br /> (inches) Gal. Cu. ft. (inches) Gal. Cu. Ft. <br /> --------------------------------- <br /> 7.25 2. 14 0.29 2 1 . 91 0.26 <br /> 8.25 2. 78 0.37 2 2. 55 0.34 <br /> 10.25 4.29 0. 57 2 4.06 0.54 <br /> ' 10.25 4.29 0.57 4 3.46 0.46 <br /> 12.25 6. 13 0.82 4 5.30 0.71 <br /> *Note: Annular volumes will be multiplied by 30$ to account for <br /> ' porosity of filter pack. <br /> if the aquifer is slow to recharge, development will <br /> continue until recharge is too slow to practically continue. <br /> The volume of water produced versus time will be recorded. <br /> All withdrawn groundwater will be stored on-site in 55 <br /> gallon waste drums unless permission is granted by the <br /> appropriate regulatory agency to discharge the water to the <br /> I ground surface or sanitary sewer. Drummed water will be <br /> labeled with the source of the water to help ensure <br /> appropriate disposal based on contamination levels. <br /> ' 11.0 Soil Sampling Protocol <br /> 11. 1 Sample Collection During Drilling Activities <br /> ' A proposal will be submitted to the lead Regulatory <br /> Authority with proposed boring/sampling locations. The <br /> 1 exact location and number of borings at each site will be <br /> determined in the field by the Project Geologist/Engineer. <br /> Prior to arriving at the sample site, the drill rig/augers <br /> will be steam cleaned and all sample equipment will be <br /> cleaned. Cleaning will be conducted on-site on all sampling <br /> equipment between each sample interval. <br /> Soil samples will be obtained using a California modified <br /> split-spoon sampler containing three, six inch long, two <br /> inch diameter brass tubes. The sampler will be driven 18 <br /> inches ahead of the hollow stem auger by a 140 pound hammer <br /> with a 30 inch drop in accordance with American Society for <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.