My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 4:41:45 PM
Creation date
6/11/2020 2:30:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5/14/2019 F-Series"Full Body"I Bravo <br /> Eos Angeles (Times <br /> BRAVO <br /> PROIS'LEM SOLVE13 �... ..., .�.,. <br /> U� <br /> I r3! <br /> Hearne Products Resources Distributors Representatives Company Cont_a; <br /> Single l Double <br /> wall wall <br /> F-Series "Full Body" a'ro <br /> Ail-Fiberglass"Full Body'Fittings For SingleWall Sumps .. <br /> The F-Series"Full Body"line of entry fittings are a next-generation all-fiberglass <br /> design.This is a bonded fitting that lacks all of the common points of failure ' <br /> such as nuts,bolts,gaskets,clamps,boots,mechanical seals and sealants. ' <br /> Read more <br /> See also: <br /> X <br /> Key Features Tech Specs Options <br /> Documentation <br /> • Made in the USA(i) F-Series Datasheet <br /> • FRP Construction!Built like a Tank(i) Pass-Through Vapor Datasheet <br /> • Compatible with all fuels(i) Grounding Rod Datasheet <br /> • For 1"and 314"galvanized and PVC coated conduit Installation Manual for Size over Size <br /> • For 2", 3",4"and 6"fiberglass pipe, including LCX coaxial Installation Manual for LCX Coaxial <br /> • Uni-body design with integrated exterior flange Installation Manual for Conduit <br /> • Single loose flange for interior <br /> • NO failure-prone materials or components Datasheet for Adjustable(ADJ)Variant <br /> • Injection port(s)for adhesive injection Installation Addendum for ADJ <br /> • Factory-machined surfaces (i) PDF CAD Drawing Pack <br /> • Dual secondary test ports <br /> • Stainless steel tester for monitoring secondary pipe. Request CAD .dwg drawings <br /> • Kitted: Includes installation accessories (i) Fuel Compatibility Letter <br /> • Third Party Approved 30 Year Warranty <br /> • UL&CUL Listed <br /> » 30 Year Warranty(i) Downloads are subject to our T&C <br /> Last updated 04-16-18 <br /> Navigation Contact <br /> i'roducts 800-282-7286 <br /> Distributors 323-205-3860 Fax <br /> sbravo.com/fittings/f-series/ 112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.