Laserfiche WebLink
LEGEND FOR ACRONYMS SCOPE OF WORK : GEMCO TRUCK PLAZA , 1022 FRONTAGE RD . , RIPON <br /> AC ASPHALT CONCRETE <br /> ASSY ASSEMBLY 1 . DEMOLITION : REMOVE MOTOR FUEL DISPENSER , BOLLARDS & ISLAND LIGHT POLES . <br /> AST ABOVE GROUND STORAGE TANK 2 , DIESEL FUEL LINE FROM TANK FARM TO THE VAULT SHALL BE MARKED CLEARLY ON THE ASPHALT PAVEMENTS , <br /> BM BENCH MARK <br /> o _ _ <br /> BOT BOTTOM OF TANK 3 . LAYOUT , SAW CUT , REMOVE AND DISPOSE OF ASPHALT PAVING AND CONCRETE , <br /> CCEWCS CENTER TO CENTER EACH WAY CENTERED IN SLAB m _ <br /> CFC CALIFORNIA FIRE CODE 4 . PREPARE AND REMOVE MOTOR FUEL PRODUCT PIPING FOLLOWING INDUSTRY STANDARDS , OBTAIN NECESSARY <br /> CTE CONNECT TO EXISTING PERMITS . TAKE SOIL SAMPLES AS REQUIRED . a <br /> DW DOUBLE WALL <br /> 0 <br /> S <br /> E EXISTING <br /> 5 , SECURE AREA OF WORK WITH FENCES AND OR BARRICADES AS APPROPRIATE FOR THE WORK BEING PERFORMED , <br /> ELEV ELEVATION <br /> EYS ELECTRICAL CONDUIT SEAL OFF 6 , EXCAVATE FOR THE CANOPY FOUNDATIONS AND BOLLARDS PER DETAILS , <br /> Y <br /> FG FINISH GRADE 7 , SET FORMS FOR CANOPY FOUNDATIONS AND BOLLARDS , SET REINFORCEMENT , PLACE CONCRETE PER CANOPY p <br /> FOS FUEL OIL SUPPLY <br /> FOR FUEL OIL RETURN MANUFACTURES APPROVED SHOP DRAWINGS . <br /> FNPT FEMALE NATIONAL PIPE THREAD (D <br /> 8 . CONSTRUCT NEW CANOPY . a <br /> FRP FIBERGLASS REINFORCED PLASTICW O <br /> FSC FUEL SYSTEMS CONTRACTOR 9 . EXCAVATE FOR MOTOR FUEL DISPENSER UDC ' S AND PRODUCT PIPING , W U) <br /> GAL GALLON <br /> GALV GALVANIZE 10 . SET FORM AND INSTALL UDC' S . <br /> GV GATE VALVE 11 . INSTALL PRODUCT & VAPOR PIPING , PERFORM TESTING OF SAME . <br /> MH MANHOLE <br /> MPD MULTI - PRODUCT DISPENSER 12 , THE EXISTING DIESEL FUEL DISTRIBUTION VAULT WILL REMAIN IN SERVICE DURING THIS PHASE . DIESEL VAULT <br /> Z <br /> 0 <br /> IS CONNECTED TO THE ABOVE GROUND DIESEL TANKS . THE PLANS FOR THE DIESEL FUELING AREA ARE ALREADY a <br /> ( N ) NEW o <br /> A a m r> <br /> PPROVED BY THE RIPON FIRE DEPARTMENT AND WILL BE CONSTRUCTED IN FIRST PHASE AND COMPLETED BEFORE v, <br /> INC NORMALLY CLOSED Y m rn <br /> MOTOR FUELING AREA ( PHASE II ) IS STARTED . <br /> U � <br /> NEC NATIONAL ELECTRICAL CODE It 2 u <br /> NEPA NATIONAL FIRE PROTECTION ASSOCIATION 13 . PROTECT EXISTING UTILITIES FROM DAMAGE DURING THIS WORK . 0 N a <br /> PCC PORTLAND CEMENT CONCRETE 14 . SHEET F-5 IS TO BE MARKED UP BY ARCHITECT/ENGINEER GIVING FINISH GRADES ON FUEL LANES SLABS AND VAULT RIM , <br /> CU <br /> PEN FTG PENETRATION FITTING c <br /> 15 . TRENCHING AND BACKFILL REQUIREMENTS FOR PIPING SEE SHEET F-9 . <br /> PF PER FOOT E <br /> PG PEA GRAVEL 16 . UPGRADE VEEDER- ROOT MONITORING PANEL AS APPLICABLE . o <br />! PRIM PRIMARY w 0 <br /> 17 . INSTALL NOV SMITH -FIBERCAST FRP MOTOR FUEL PIPING WITH SECONDARY CONTAINMENT PER MANUFACTURES o a) >RC RIGID CONDUIT <br /> o � m <br /> Sc SECONDARY CONTAINMENT INSTALLATION INSTRUCTIONS . °� ` 0 <br /> Z mGo <br /> (n ._ U) o <br /> SO SEAL OFF � m � D <br /> 18 . ARRANGE FOR ALL INSPECTIONS REQUIRED BY PERMITS ISSUED FOR THE WORK AND PROVIDE APPROVAL OF u� � co C) <br /> ST STRUCTURALTUBE <br /> STP SUBMERGED TURBINE PUMP INSPECTIONS TO THE OWNER OF SAME . <br /> Date: <br /> i <br /> TOMH TOP OF MANHOLE 19 . CONSTRUCT CONCRETE PAVEMENTS AS PER PLANS AND SPECIFICATIONS . 7/22119 - <br /> TOP TOP OF PIPING 20 . INSTALL BOLLARDS FURNISHED BY OWNER AS PER DRAWINGS , SEE F-6 <br /> Scale : <br /> TOS TOP OF SUMP <br /> 21 , PAINT BOLLARDS PER SHEET F -6 . <br /> TOT TOP OF TANK As Shown <br /> � UDC UNDER DISPENSER CONTAINMENT 22 . INSTALL MOTOR FUEL DISPENSERS PROVIDING START-UP OF THE FUEL SYSTEM , <br /> VFL VAPOR FLOW LEVEL Sheet No : <br /> 23 . LEAVE WORK AREA BROOM CLEAN UPON COMPLETION OF ALL WORK , <br /> VR VEEDER- ROOT <br /> 24 , ALL WORK UNDER THIS CONTRACT SHALL BE DONE TO INDUSTRY STANDARDS , ALL APPLICABLE CODES AND PERMITS F2 <br />