My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 4:41:45 PM
Creation date
6/11/2020 2:30:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEGEND FOR ACRONYMS SCOPE OF WORK : GEMCO TRUCK PLAZA , 1022 FRONTAGE RD . , RIPON <br /> AC ASPHALT CONCRETE <br /> ASSY ASSEMBLY 1 . DEMOLITION : REMOVE MOTOR FUEL DISPENSER , BOLLARDS & ISLAND LIGHT POLES . <br /> AST ABOVE GROUND STORAGE TANK 2 , DIESEL FUEL LINE FROM TANK FARM TO THE VAULT SHALL BE MARKED CLEARLY ON THE ASPHALT PAVEMENTS , <br /> BM BENCH MARK <br /> o _ _ <br /> BOT BOTTOM OF TANK 3 . LAYOUT , SAW CUT , REMOVE AND DISPOSE OF ASPHALT PAVING AND CONCRETE , <br /> CCEWCS CENTER TO CENTER EACH WAY CENTERED IN SLAB m _ <br /> CFC CALIFORNIA FIRE CODE 4 . PREPARE AND REMOVE MOTOR FUEL PRODUCT PIPING FOLLOWING INDUSTRY STANDARDS , OBTAIN NECESSARY <br /> CTE CONNECT TO EXISTING PERMITS . TAKE SOIL SAMPLES AS REQUIRED . a <br /> DW DOUBLE WALL <br /> 0 <br /> S <br /> E EXISTING <br /> 5 , SECURE AREA OF WORK WITH FENCES AND OR BARRICADES AS APPROPRIATE FOR THE WORK BEING PERFORMED , <br /> ELEV ELEVATION <br /> EYS ELECTRICAL CONDUIT SEAL OFF 6 , EXCAVATE FOR THE CANOPY FOUNDATIONS AND BOLLARDS PER DETAILS , <br /> Y <br /> FG FINISH GRADE 7 , SET FORMS FOR CANOPY FOUNDATIONS AND BOLLARDS , SET REINFORCEMENT , PLACE CONCRETE PER CANOPY p <br /> FOS FUEL OIL SUPPLY <br /> FOR FUEL OIL RETURN MANUFACTURES APPROVED SHOP DRAWINGS . <br /> FNPT FEMALE NATIONAL PIPE THREAD (D <br /> 8 . CONSTRUCT NEW CANOPY . a <br /> FRP FIBERGLASS REINFORCED PLASTICW O <br /> FSC FUEL SYSTEMS CONTRACTOR 9 . EXCAVATE FOR MOTOR FUEL DISPENSER UDC ' S AND PRODUCT PIPING , W U) <br /> GAL GALLON <br /> GALV GALVANIZE 10 . SET FORM AND INSTALL UDC' S . <br /> GV GATE VALVE 11 . INSTALL PRODUCT & VAPOR PIPING , PERFORM TESTING OF SAME . <br /> MH MANHOLE <br /> MPD MULTI - PRODUCT DISPENSER 12 , THE EXISTING DIESEL FUEL DISTRIBUTION VAULT WILL REMAIN IN SERVICE DURING THIS PHASE . DIESEL VAULT <br /> Z <br /> 0 <br /> IS CONNECTED TO THE ABOVE GROUND DIESEL TANKS . THE PLANS FOR THE DIESEL FUELING AREA ARE ALREADY a <br /> ( N ) NEW o <br /> A a m r> <br /> PPROVED BY THE RIPON FIRE DEPARTMENT AND WILL BE CONSTRUCTED IN FIRST PHASE AND COMPLETED BEFORE v, <br /> INC NORMALLY CLOSED Y m rn <br /> MOTOR FUELING AREA ( PHASE II ) IS STARTED . <br /> U � <br /> NEC NATIONAL ELECTRICAL CODE It 2 u <br /> NEPA NATIONAL FIRE PROTECTION ASSOCIATION 13 . PROTECT EXISTING UTILITIES FROM DAMAGE DURING THIS WORK . 0 N a <br /> PCC PORTLAND CEMENT CONCRETE 14 . SHEET F-5 IS TO BE MARKED UP BY ARCHITECT/ENGINEER GIVING FINISH GRADES ON FUEL LANES SLABS AND VAULT RIM , <br /> CU <br /> PEN FTG PENETRATION FITTING c <br /> 15 . TRENCHING AND BACKFILL REQUIREMENTS FOR PIPING SEE SHEET F-9 . <br /> PF PER FOOT E <br /> PG PEA GRAVEL 16 . UPGRADE VEEDER- ROOT MONITORING PANEL AS APPLICABLE . o <br />! PRIM PRIMARY w 0 <br /> 17 . INSTALL NOV SMITH -FIBERCAST FRP MOTOR FUEL PIPING WITH SECONDARY CONTAINMENT PER MANUFACTURES o a) >RC RIGID CONDUIT <br /> o � m <br /> Sc SECONDARY CONTAINMENT INSTALLATION INSTRUCTIONS . °� ` 0 <br /> Z mGo <br /> (n ._ U) o <br /> SO SEAL OFF � m � D <br /> 18 . ARRANGE FOR ALL INSPECTIONS REQUIRED BY PERMITS ISSUED FOR THE WORK AND PROVIDE APPROVAL OF u� � co C) <br /> ST STRUCTURALTUBE <br /> STP SUBMERGED TURBINE PUMP INSPECTIONS TO THE OWNER OF SAME . <br /> Date: <br /> i <br /> TOMH TOP OF MANHOLE 19 . CONSTRUCT CONCRETE PAVEMENTS AS PER PLANS AND SPECIFICATIONS . 7/22119 - <br /> TOP TOP OF PIPING 20 . INSTALL BOLLARDS FURNISHED BY OWNER AS PER DRAWINGS , SEE F-6 <br /> Scale : <br /> TOS TOP OF SUMP <br /> 21 , PAINT BOLLARDS PER SHEET F -6 . <br /> TOT TOP OF TANK As Shown <br /> � UDC UNDER DISPENSER CONTAINMENT 22 . INSTALL MOTOR FUEL DISPENSERS PROVIDING START-UP OF THE FUEL SYSTEM , <br /> VFL VAPOR FLOW LEVEL Sheet No : <br /> 23 . LEAVE WORK AREA BROOM CLEAN UPON COMPLETION OF ALL WORK , <br /> VR VEEDER- ROOT <br /> 24 , ALL WORK UNDER THIS CONTRACT SHALL BE DONE TO INDUSTRY STANDARDS , ALL APPLICABLE CODES AND PERMITS F2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.