LEGEND FOR ACRONYMS <br /> SCOPE OF WORK : GEMCO TRUCK PLAZA, 10: <br /> AC ASPHALT CONCRETE 1 , DEMOLITION : REMOVE EXISTING MOTOR FUEL DISPENSER , t <br /> ASSY ASSEMBLY <br /> AST ABOVE GROUND STORAGE TANK 2 . DIESEL FUEL LINE FROM TANK FARM TO THE VAULT SHALL E <br /> BM BENCH MARK 3 . LAYOUT , SAW CUT , REMOVE AND DISPOSE OF ASPHALT PAV <br /> BOT BOTTOM OF TANK <br /> CCEWCS CENTER TO CENTER EACH WAY CENTERED IN SLAB 4 . PREPARE AND REMOVE MOTOR FUEL PRODUCT PIPING FOLI <br /> CFC CALIFORNIA FIRE CODE <br /> CTE CONNECT TO EXISTING PERMITS . TAKE SOIL SAMPLES AS REQUIRED . <br /> DW DOUBLE WALL 5, SECURE AREA OF WORK WITH FENCES AND OR BARRICADE ; <br /> ( E ) EXISTING <br /> ELEV ELEVATION 6 . EXCAVATE FOR THE CANOPY FOUNDATIONS AND BOLLARDS <br /> EYS ELECTRICAL CONDUIT SEAL OFF <br /> 7 . SET FORMS FOR CANOPY FOUNDATIONS AND BOLLARDS . SE <br /> FG FINISH GRADE <br /> FOS FUEL OIL SUPPLY MANUFACTURES APPROVED SHOP DRAWINGS . <br /> FOR FUEL OIL RETURN <br /> FNPT FEMALE NATIONAL PIPE THREAD 8 . CONSTRUCT NEW CANOPY . <br /> FRP FIBERGLASS REINFORCED PLASTIC <br /> 9 . EXCAVATE FOR MOTOR FUEL DISPENSER UDC'S AND PROD <br /> FSC FUEL SYSTEMS CONTRACTOR t, <br /> GAL GALLON 10 . SET FORM AND INSTALL SINGLE WALL UDC'S . <br /> GALV GALVANIZE <br /> GV GATE VALVE 11 . INSTALL PRODUCT & VAPOR PIPING , PERFORM TESTING OF <br /> MH MANHOLE <br /> 12 . THE EXISTING DIESEL FUEL DISTRIBUTION VAULT WILL RE <br /> MPD MULTI-PRODUCT DISPENSER <br /> IS CONNECTED TO THE ABOVE GROUND DIESEL TANKS . THI <br /> ( N ) NEW APPROVED BY THE RIPON FIRE DEPARTMENT AND WILL BE <br /> NC NORMALLY CLOSED MOTOR FUELING AREA (PHASE 11 ) IS STARTED . <br /> NEC NATIONAL ELECTRICAL CODE 13 , PROTECT EXISTING UTILITIES FROM DAMAGE DURING THIS <br /> NEPA NATIONAL FIRE PROTECTION ASSOCIATION <br /> 14 . SHEET F-5 IS TO BE MARKED UP BY ARCHITECT/ENGINEER G <br /> PCC PORTLAND CEMENT CONCRETE <br /> PEN FTG PENETRATION FITTING 15 , TRENCHING AND BACKFILL REQUIREMENTS FOR PIPING SEE <br /> PF PER FOOT <br /> 16 , UPGRADE VEEDER-ROOT MONITORING PANEL AS APPLICABI <br /> PG PEA GRAVEL <br /> PRIM PRIMARY 17 , INSTALL NOV SMITH <br /> -FIBERCAST FRP MOTOR FUEL PIPING W <br /> RC RIGID CONDUIT <br /> INSTALLATION INSTRUCTIONS . <br /> Sc SECONDARY CONTAINMENT <br /> SO SEAL OFF 18. ARRANGE FOR ALL INSPECTIONS REQUIRED BY PERMITS IS : <br />