Laserfiche WebLink
IN <br /> = oP�� CGZ SAN 10AQUIN Environmental Health Department <br /> � o <br /> COUNTY Kasey Foley , REHS , Interim Director <br /> P <br /> \ciFoa? Greatness grows here . PROGRAM COORDINATORS <br /> — Robert McClellon , REHS <br /> Jeff Carruesco , REHS , RDI <br /> Willy Ng , REHS <br /> Muniappa Naidu , REHS <br /> Michael Kith , REHS <br /> Melissa Nissim , REHS <br /> January 28 , 2020 <br /> JOHN BOREL WINNER JR LIC #824489 <br /> 1045 AIRPORT BLVD . <br /> SOUTH SAN FRANCISCO , CA 94080 <br /> Re : GEMCO RIPON TRUCK PLAZA INC . Amended SR0080216 <br /> 1022 E FRONTAGE RD , RIPON , CA 95366 <br /> The San Joaquin County Environmental Health Department ( EHD) has completed the review of the <br /> application for a permit to : <br /> • Replace existing product piping <br /> • Replace existing dispensers and UDCs <br /> • Install additional UDCs and dispensers <br /> • Install sensors in new UDCs . <br /> • Upgrade the monitoring panel <br /> on the underground storage tank ( UST) system at the above noted address . The permit has been <br /> approved with the following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control District for <br /> any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work . All new addenda supersede the previous ones . <br /> 3 . Provide written notification to ust@sjgov . org or contact Shewit Woldearegay at (209) 468- 0216 <br /> to arrange the following appointments (a 48-hour notice is required for inspection <br /> appointments) . <br /> a) Witness water and/ or soil sampling under removed UDCs and any removed piping . <br /> b) Primary piping soap test of all piping and penetrations ( product) : One hour pneumatic pressure <br /> test at 110 % of operating pressure , or 40 psi , whichever is greater . <br /> c) Secondary piping soap test of all piping and penetrations ( product) : One- hour pressure test at <br /> the manufacturers recommended specification . <br /> d ) Secondary piping slope , at 1 / 8 inch per foot or greater, to a containment sump with an <br /> audible/visual alarm . <br /> e) Verification of all pipe setbacks and burial depth according to the manufacturer' s installation <br /> Instructions . Verification of appropriate backfill . <br /> f) If concrete will be broken near the tanks , sumps , or existing piping , a secondary containment <br /> test must be performed on the affected components once concrete is poured in accordance <br /> with the manufacturer' s guidelines . <br /> g ) Sensor functionality : Functionality of the monitoring system must be verified to ensure that <br /> monitoring has been restored to meet the requirements of Title 23 California Code of <br /> Regulations and the Health & Safety Code . If it is determined that a cold start is necessary , a <br /> copy of the alarm history shall be printed prior to performing the "cold start" of the Veeder Root <br /> system and made available at the time of EHD inspection . <br /> 1868 E . Hazelton Avenue I Stockton , California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www. sjgov . org/ehd <br />