My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 4:41:45 PM
Creation date
6/11/2020 2:30:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rpcor;rrended Practices for Installation of Underground Liquid Storage Systems <br /> 6o D 6 � � .•6� C.c 4 0 4 D p 60. 4 p C ©0 C <br /> paving D D c o D c 6 \ � c <br /> D' 6 .p 46 � v p c D C C D <br /> o � 4 <br /> V. <br /> D �. D � a_ o c 40 � �' D p q °- � C � I <br /> . . . . . Shear <br /> . . . . . 18 . section <br /> :'St• . '. - . . . . . . Y-�.yfrF d 0 4 •a c- D C <br /> s t'�;• 6 �j+- 4 4 �=-6 <br /> .• . . . . . . . - . . . . gs:. C o o C <br /> '+'.*` <br /> s y r �• !� <br /> 17 <br /> ' �tbypt 'i T.- <br /> ;: <br /> _ EY...:-.L ...e .. --'u:3!!'U.v`W�) 45-, Y9•��,} �-V �,n'�L•IS�P! <br /> J All dimensions in inches. ;; <br /> =t;3•r-,ng•,�snp.�,:y;z :! •.'%sa_ts!i�. `�.:i �•.•.}ta�"`t:-,a's,;..,�:r:y,_ Y..c, ..? .• <br /> Figure 26.Trench dimensions.Pipe trenches must allow <br /> adequate clearance and cover to protect piping and coatings <br /> from physical damage.Backfilling and compaction <br /> requirements are the same as for tank excavations. Two-inch <br /> pipe is illustrated For other sizes, use twice the pipe diameter Figure 27.Emergency shutoff valve. In case of fire or collision, <br /> between pipes. the emergency shutoff valve stops theflow of fuel. Install the <br /> shear section level with the top of the dispenser islands. Do <br /> 1. Inspect all piping materials prior to installation not obstruct moving parts. Securely anchor the valve. <br /> to detect damage caused by shipping and han- <br /> dling and to confirm compliance with specifica- bottom. Measure this distance for each pipe and <br /> tions.Handle piping carefully at the jobsite,and tarok carefully. Also, verify the length of sub- <br /> place it carefully into position. mersible pumps,and monitor and gauge probes <br /> 2. Provide adequate clearance between piping and before installing. <br /> trench walls,electrical conduit,monitoring wells, 9. Do not remove dielectric bushings.Take care to <br /> utilities, nearby structures, and other system avoid cross-threading. <br /> components. 10. Install pumps,check valves,impact valves,flex- <br /> 3. If crossing of lines is unavoidable, provide ible connectors, overfill devices, gauges, moni- <br /> adequate clearance to prevent contact. Consult toring systems,and other system components in <br /> manufacturer's instructions for the minimum accordance with manufacturers' recommenda- <br /> clearance required for the type of piping being tions. <br /> installed. 11. Ensure that the submersible pump and attached <br /> 4. Avoid damage to piping materials or coatings piping are free to move with the tank and are <br /> during handling, installation,testing,and back- separated from the traffic slab with a street box to <br /> filling. prevent damage from settlement. <br /> 5. Keep pipe,as well as fitting interiors and threads, 12. Use extractor fittings at tank connections to <br /> free from dirt, corrosion, moisture, and debris. facilitate future testing. <br /> 6. Exercise care to accurately measure and cut pipe 9.6 Piping Requirements:Metallic Piping.The mini- <br /> to avoid the failure that can occur when pipe mum standard for metallic product piping should be at least <br /> fittings are installed under stress. Schedule 40 factory-wrapped/coated black steel pipe.with <br /> 7. Use a pipe sealant (dope or cement) that is comparable malleable iron or steel screw-type fittings and <br /> compatible with the piping materials and the extra-heavy couplings.The following constitute elements <br /> product being handled on tapered thread joints. of good practices for metallic piping systems. <br /> Wrap ribbon dope with the threads to avoid 1. Protect all piping from physical damage with <br /> bunching during tightening. Follow the nonconductive material at any point where it <br /> manufacturer's preparation and application in- passes through pavement and structures. <br /> structions, giving proper attention to tempera- 2. Inspect pipe-cutting dies frequently and replace <br /> ture and moisture condition limitation. when worn. Threaded metallic piping depends <br /> 8. Avoid damage to the tank bottom- Cut suction on a liquid-tight,metal-to-metal seal to prevent <br /> and fill lines to allow for at least 4 inches and no leaks. Du11 dies may extrude or tear threads; <br /> more than 6 inches clearance from the tank making a tight seal impossible. <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.