Laserfiche WebLink
STEP 8 CCOMPLETE ❑ <br /> BEAD EPDXY <br /> HEAVILY ON ALL SEAMS <br /> p <br /> 74360 ' DEGREES AROUND <br /> FITTING BEFORE <br /> CLEANUP <br /> i <br /> Q PIPE CLAMP <br /> SEAL YOUR FITTING <br /> BODY TOGETHER . <br /> � d � <br /> Stick this assembly to the wall and apply a strong pressure to push the halves <br /> together and against the wall . Epoxy should ooze from every seam and joint. Clean the <br /> face of the fitting with acetone or equivalent and remove excess epoxy. You want the fit - <br /> ting clean enough to remove the pipe clamp after the fitting cures . <br /> Use provided pipe clamp to secure the fitting halves to each other. More epoxy may <br /> ooze from the split seams as you tighten , re - clean as necessary. <br /> LET THE FITTING CURE DO NOT ALLOW THE PIPE OR <br /> CONDUITS TO MOVE OR TWIST DURING THE CURE STAGE <br /> After a full cure , remove the pipe clamp holding the two fitting halves together. If it is <br /> too difficult to remove and appears to be bonded in place , do not force it off. <br /> STEP 9 Water Testin g : COMPLETE ❑ <br /> After the F -Series Retrofit-S Fittings are installed and have fully cured , water level test to a <br /> minimum of 2 " above the highest penetration fitting on the sump . Follow local regulations . <br /> If this Retrofit was installed to steel sumps : <br /> Re -coat and corrosion - protect any exposed steel around the fitting area . <br /> 13 ii - F- Series- Retrofit- S - 15A <br />