Laserfiche WebLink
5 <br /> <br />Double-wall and Double-bottom AST Requirements: <br />*Double-wall AST’s do not require UTT readings for the primary tank. If Corrosion is evident on the outside <br />surface of the secondary tank, UTT readings are required. <br />Verify leak detection equipment or method is operating (if tank is so equipped): Yes <br />Check for leaks / liquid in the interstice: Interstice was clear at the time of inspection. <br />- If liquid was found in the interstice, were thickness measurements taken of the secondary tank: Yes No <br />- If product was found in the interstice, was a leak test performed on the Primary Tank: Yes No <br />Any areas of the Double-bottom AST single wall: N/A <br />- If yes, were UTT readings of the single wall areas of the AST taken (Required): Yes No <br /> <br />Water found / observed in the Tank? No <br />Determination Method: Monitoring system / Water paste / Fuel sample / Other: ___Print out reviewed. _______ <br />Notes / Comments about the Inspection: ____See Notes in SP001 Report. <br />_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />Required Actions for Continued Service: See Notes in SP001 Report. <br />_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />Recommended Actions for Continued Service: See Notes in SP001 Report. <br />_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />_____________________________________________________________________________________________ <br />Data Collected Onsite: <br />UT Readings / Tank Monitor Printout / Tank Sketch / Tank Drawings / Leak Test / Previous Inspection Reports / <br />Tank Test Results / Photos / Other: ________________________________________________________________ <br />Tank Suitable for Continued Use as of Inspection Date: *Yes / No *Assumes required actions are implemented. <br />Next Formal SP001 Inspection Due By: 11/24/2025 <br />