The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for Caltrans- Stockton as of June 11 2020. <br /> Open violations from May 23 , 2019 inspection <br /> Violation #301 - Failed to amend Plan as necessary . <br /> The 55 gallon drums and 100 gallon hydraulic lift oil container have been permanently removed from the facility. The <br /> 55 gallon drum of used oil described in the SPCC plan as being in the Hazardous Materials Storage bin by the <br /> Material Storage bin and the hydraulic oil tank for the lift were said to have been removed more than six months <br /> ago . The Spill Prevention , Control , and Countermeasure ( SPCC ) Plan must be amended when there is a change in <br /> the facility design , construction , operation , or maintenance that materially affects its potential for a discharge , within <br /> 6 months of the change , and implemented as soon as possible , not later than 6 months following preparation of the <br /> amendment. Immediately make all necessary amendments to the SPCC Plan to accurately represent the <br /> procedures and policies currently in place at the facility. <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #601 - Failure of Plan to fulfill basic requirements including a cross -referencing section . <br /> The Spill Prevention , Control , and Countermeasure (SPCC ) Plan does not follow the order or requirements in 40 <br /> CFR Part 112, and a complete cross-reference was not provided . 40 CFR section 112. 8 applies to the facility and is <br /> not part of the cross-reference or called out in the SPCC plan . If you do not follow the sequence specified in 40 <br /> CFR 112 for the Plan , you must prepare an equivalent Plan and supplement it with a section cross-referencing the <br /> location of requirements in 40 CFR 112 and the equivalent Plan . The SPCC Plan should include a complete <br /> cross-reference or follow the required sequence . <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> i <br /> i <br /> I <br /> I <br /> I <br /> t <br /> Violation #618 - Failed to keep records of procedures , inspections , or integrity tests for three years . <br /> Copies of inspection for the annual inspections required by the SPCC plan and the referenced SP-001 standard <br /> were not found on site . Inspections and tests must be conducted in accordance with the written procedures <br /> developed in the Spill Prevention , Control , and Countermeasure (SPCC ) Plan . Records of these inspections and <br /> tests must be signed by the appropriate supervisor or inspector and kept on site with the SPCC Plan for a period of <br /> three years . Immediately locate a copy of all inspection and testing records for the last three years , maintain them <br /> on site , and submit copies to the EHD . <br />[k <br /> PAnP 1 of 9 <br />