My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1604
>
2200 - Hazardous Waste Program
>
PR0515766
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 4:26:27 PM
Creation date
6/11/2020 4:25:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0515766
PE
2832
FACILITY_ID
FA0003683
FACILITY_NAME
Caltrans-Stockton
STREET_NUMBER
1604
Direction
S
STREET_NAME
B
STREET_TYPE
St
City
Stockton
Zip
95206
APN
171-090-08
CURRENT_STATUS
01
SITE_LOCATION
1604 S B St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for Caltrans- Stockton as of June 11 2020. <br /> Open violations from May 23 , 2019 inspection <br /> Violation #301 - Failed to amend Plan as necessary . <br /> The 55 gallon drums and 100 gallon hydraulic lift oil container have been permanently removed from the facility. The <br /> 55 gallon drum of used oil described in the SPCC plan as being in the Hazardous Materials Storage bin by the <br /> Material Storage bin and the hydraulic oil tank for the lift were said to have been removed more than six months <br /> ago . The Spill Prevention , Control , and Countermeasure ( SPCC ) Plan must be amended when there is a change in <br /> the facility design , construction , operation , or maintenance that materially affects its potential for a discharge , within <br /> 6 months of the change , and implemented as soon as possible , not later than 6 months following preparation of the <br /> amendment. Immediately make all necessary amendments to the SPCC Plan to accurately represent the <br /> procedures and policies currently in place at the facility. <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #601 - Failure of Plan to fulfill basic requirements including a cross -referencing section . <br /> The Spill Prevention , Control , and Countermeasure (SPCC ) Plan does not follow the order or requirements in 40 <br /> CFR Part 112, and a complete cross-reference was not provided . 40 CFR section 112. 8 applies to the facility and is <br /> not part of the cross-reference or called out in the SPCC plan . If you do not follow the sequence specified in 40 <br /> CFR 112 for the Plan , you must prepare an equivalent Plan and supplement it with a section cross-referencing the <br /> location of requirements in 40 CFR 112 and the equivalent Plan . The SPCC Plan should include a complete <br /> cross-reference or follow the required sequence . <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> i <br /> i <br /> I <br /> I <br /> I <br /> t <br /> Violation #618 - Failed to keep records of procedures , inspections , or integrity tests for three years . <br /> Copies of inspection for the annual inspections required by the SPCC plan and the referenced SP-001 standard <br /> were not found on site . Inspections and tests must be conducted in accordance with the written procedures <br /> developed in the Spill Prevention , Control , and Countermeasure (SPCC ) Plan . Records of these inspections and <br /> tests must be signed by the appropriate supervisor or inspector and kept on site with the SPCC Plan for a period of <br /> three years . Immediately locate a copy of all inspection and testing records for the last three years , maintain them <br /> on site , and submit copies to the EHD . <br />[k <br /> PAnP 1 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.