My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY_CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
29633
>
2900 - Site Mitigation Program
>
PR0541086
>
SITE HISTORY_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2020 11:14:11 AM
Creation date
6/12/2020 11:08:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
FileName_PostFix
CASE 1
RECORD_ID
PR0541086
PE
2960
FACILITY_ID
FA0003781
FACILITY_NAME
TRACY AIRPORT
STREET_NUMBER
29633
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
25311031
CURRENT_STATUS
02
SITE_LOCATION
29633 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> KFILL EXCAVATION CERTIFICATE 1 <br /> M <br /> Project Location <br /> Phone No. = <br /> Owner f `-t <br /> Contractor ?--' t <br /> INDICATE \4ETHOD OF BACKFILL QUALITY ASSURANCE <br /> —� 1. Submission of Soil Engineer's Compaction Report within;0 days of project completion. or <br /> 2. Submission of verification. load ticket, within 30 days of project completion [hat one of die following materials was <br /> placed in the excavation in 12" lifts: <br /> A <br /> pea gavel--simooch. rounded naterial not more than ane-half(11, inch in diameter <br /> S. C:Z:shed rock--seif-compacting material no[ more [ban :twee-quartets (2;'4) inc;"., M cross sectional <br /> measurement. (Use of Crushed rock will not be permitted for backfil if contact will be made berxeen <br /> the backfill material and [anks/pipes [made of poly resin ;lass or similar materials.) <br /> DECLARATION. <br /> I .e:eby certify hat a Soil Engineer's Compaction Report will be submitted within 30 days of oroject completion, or submission of <br /> ve ification that ue select material described above will be placed at a minimum of ive (�) cubic yards re- 1000 gallon tank <br /> displacement and that the entire excavation will be backliiled and compacted to insure compliance with he Uniform Sunning Cade <br /> Appendix Chapte- 70. ° <br /> tic <br /> ame rant) <br /> u e l_ tint) <br /> tgnanire <br /> Shall be the responsible maiiagin7 employee on the license or authorized agent. <br /> Y, <br />
The URL can be used to link to this page
Your browser does not support the video tag.