My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
0
>
2900 - Site Mitigation Program
>
PR0545715
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:23 PM
Creation date
6/12/2020 11:17:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545715
PE
2950
FACILITY_ID
FA0025893
FACILITY_NAME
PROPOSED SHELL
STREET_NUMBER
0
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
0 HWY 12
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A-4 <br /> 4.1 Personnel Responsibilities <br /> Key personnel directly involved in the investigation who will be responsible for monitoring the execution of <br /> safe work practices and the provisions of this plan are 1) the drilling-subcontractor project supervisor and <br /> 2) the Delta project field manager. These personnel are responsible for knowing the provisions of the plan, <br /> communicating plan requirements to workers under their supervision and to site visitors, and for enforcing <br /> the plan. <br /> 4.2 Personnel Protection <br /> The designated personnel-protective equipment is selected to prevent field personnel from exposure to <br /> gasoline fuel products that may be present at the site. To prevent direct skin contact, the following <br /> protective clothing will be worn as appropriate while working at the site: <br /> 1) Hard hat with optional face shield <br /> 2) Tyvek coveralls <br /> 3) Butyl rubber or disposable vinyl gloves <br /> 4) Steel toed boots <br /> 5) Goggles or safety glasses (if optional face shield is not used on the'l hard hat) <br /> The type of gloves used will be determined by the type of work being performed. Drilling personnel will <br /> be required to wear butyl rubber gloves because they will have long duration contact with the subsurface <br /> materials. Delta sampling personnel will wear disposable gloves when handling any sample. These gloves <br /> will be changed between each sample. <br /> Personnel-protective equipment shall be put on before entering the immediate work area. The sleeves of <br /> the coveralls shall be outside of the cuffs of the gloves to facilitate removal of clothing with the least <br /> potential contamination of personnel. If at any time protective clothing(coveralls,boots,or gloves)becomes <br /> torn,wet, or excessively soiled, it will be replaced immediately. <br /> Total organic vapors will be monitored at the site with a portable photoionization detector (PID). Should <br /> the total organic vapor content approach that of the threshold limit value (TLV) for any of the substances <br /> of concern (benzene, toluene, ethlybenzene, or xylenes), appropriate safety precautions will be carried out <br /> w <br /> under the direction of the site project leader. These precautions include, but are not limited to, the <br /> following: 1) Donning of respirators (with appropriate cartridges)by site personnel,'2) forced ventilation of <br /> the site,3) shut-down of work until such time as appropriate safety measures sufficient to insure the health <br /> and safety of the site personnel can be implemented. <br /> The attached Health and Safety Plan provides emergency phone numbers and hospital route information for <br /> the site. The plan will be available at the site during installation of the soil borings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.